My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ __ <br />~ <br />~o-u~rt House square Presenta~vn <br />' June ~, 19'~~ <br />A) INTRODUCTION OF PROJECT TEAM MEMBERS <br />B~ OPENING C'OMMENTS Dan Berrey <br />C) OVERALL REVIEW OF PROPOSAL <br />1. Flexibi~ity o~ Project Alan Costic <br />2. Bui~c~ing Options Alan Costic <br />3. Financin~ Options Steven West~all <br />4. Cost Saving Ideas / ~ptions Dan Berrey <br />D~ SELECTION CRITERIA (as outlined on pages 8/9 0~ t~e R.F.P.) <br />1. Experience o~ the team members: Attached resumes clearly show the team's <br />bac~xground in wor~Zing in all areas o~ development. <br />2. Team's ability to unclerstand publiC agencies ancl federal contracts: All <br />team members have wor~ed wit~ projects that required an understanc~ing o~ <br />~; ~overnment contracts. More speci~ically, eac~ team member, wit~ the exception <br />o~ Mr. West~all, has wor~ec~ on projects with Marion County. <br />3. ~I'eam's ability to clevelop a project t~at meets t~e plans o~ city, county, <br />anc~ transit: We believe we have a clear understanding o~ the cli{~erent a~encies <br />needs and ~ave incorporatec~ those neec~s with the submitted proposal. <br />4. Overall Creativity: This project requires creativity at every level including <br />design, {inancin$, contruction, and leasing s~ills. We ~eel our proposal represents <br />t~e collective creativity o~ all the team members to ma~Ze this project a reality. <br />5. Integration o~ pec~estrian, transit o~~ice, parizing, ancl ot~er services: We <br />view our submitted proposal as a starting point o~ the integration o~ t~e services <br />provicled by this project. The team members will continue to "~ine tune" our plans <br />in orc~er to meet t~e needs o~ all the proposed users. <br />6. A project t~at meets t~e ~inancial and space neec~s o~ t~e county: ~e <br />have submitted t~e proposal we ~eel meets the needs as required by the R.F.P. <br />7. Developer's ability to submit a realistic proposal: Our team member's <br />~ wor~Zec~ very hard to submit a proposal t~at is a realistic and ~easible to all parties <br />
The URL can be used to link to this page
Your browser does not support the video tag.