Laserfiche WebLink
ACTION ITEM: Century West has indicated there are two ways to be testin~g on site. One <br />would be to set up a lab on site. The other way is to send soil samples to Seattle, wi results in two <br />days. Dan's concern is the environmental issues. Dan has asked Kathleen to give us some numbers <br />on the cost of putting a lab on site. Having the lab on site will enable us t have a quick <br />determination of whether the soil it hot or not. This will determine where the s il is delivered. <br />There is possibly one tank at High Street and petroleum in the soil. Larry Wacker h's been advised <br />that there may be one or more tanks in the public right of way. Dan is waiting on the~written reports. <br />Randy is meeting with Jim Sears, of Solid Waste, tomorrow to discuss the disposal d the disposal <br />fees. He is putting together a plan to reduce the disposal fees for Brown's Island. I was suggested <br />that he film the abatement and demolition. If he can get some use out of this, it will educe the fees <br />further. i <br />Public Works will not be able to provide trucks and/or drivers. This is their busy <br />RG is gone 7/26 - 8/18. During this time they will be excavating. The environm~ntal issues will <br />be the County's responsibility. Randy will be out of the office for one week, in A~gust. Dan said <br />that a GMP for the parking structure will come in during this period of time. Rand~ stated that his <br />assumption is that within the next two weeks we will have the design for the parkin~! structure. The <br />GMP will not stop the hole in August, unless someone makes a major flaw in the e timated cost of <br />the parking structure. At this point, we may review budgets, financing and cost ssues. We are <br />committed and are not going to stop the project while they figure out what to do. I <br />Adj ourned. <br />