Mechanical/Electrical Issues <br />Byron reported that all pre-e~sting plans and designs have assumed high quality systems and not <br />gone with standard pricing. They are not matching the push to good solid value. We need to <br />convey this message to the designers we aze working with to get them looking at good solid <br />value in their efforts as well. We don't want to throw away what has been done to date, but <br />give the owners options to pick and choose. Bryon can handle defining a proper level of specs <br />to set a benchmazk in a meeting with Interface. Bob McCune needs to be included in these <br />meetings. Basic systems need to be identified in order for Dave to price out costs. Pence/Kelly <br />will need to know assumptions for standards on mechanical and electrical in order to work up <br />budget pricing on the 4 and 5 floor versions by ne~rt week. <br />Dave went through cost analysis prepared using 9 options (3 floor versions each with 3 <br />treatments) of skin treatment. It pencils out to roughly $200,000 difference between the <br />schemes. <br />Alan briefly went through the schemes and drawings they had worked on during the past week. <br />The 5 story version still has some public plaza. The bus mall has not changed, just a variation in <br />the northem side of the bus mall. Streetscape would run through the block in a continuous <br />pattern. The future development space would have a 48 foot depth for retail on first level and <br />e~end out to canopy arcade on the upper floors to a depth of 60 feet. There are questions <br />surrounding how much of the north wall transit would need to build if we start before the retail <br />phase. Answers will come from the RFP's submitted by developers for the retail phase. <br />~ Additional discussion occurred regarding the outside design by increasing masonry hard surface <br />and decreasing curtain wall system. We are looking for the best of both worlds and can work <br />through this area. The glass/brick mix will ultimately be dictated by costs. The team looked at <br />different treatments and options from Arbuckle's drawings that PencelKelly used to generate <br />their numbers. Included in Dave's numbers was the back up documentation of what went into <br />the 28 foot bay from the 2°d floor up. <br />Dave and Leonazd walked through the different options using 4, 5 and 6 story versions. The 4 <br />story version came out at $30.92/s£ Dave used the skin square footage to calculate total skin <br />costs for comparisons using 4 sides to the building from the 2"d floor roof line for an average. A <br />fourth option of skin treatment came up and MNIDC would like to see a break out on costs for <br />this option as well, using a m~imum of vision glass while increasing brick. <br />Reduction in cost per square foot is important for the county. We appear to be increasing the <br />quality of the skin without increasing price at this point. We want to also replicate the same <br />character on the north side of the south tower and address this issue in the south side of the retail <br />development phase as well. <br />Time frame developed calls for Pence/Kelly to have overall project pricing between 4 and 5 <br />story versions by next Thursday. Tenant improvements will need to be firmed up as well. <br />MNIDC will have enough information to put together performa. If we are in the ball park, we <br />can go to the next step. This should take us the ne~ two weeks to complete. <br />~ <br />Page 4 of 4 <br />