My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />~ <br />COURTHOUSE SQUARE <br />7/24/97 <br />ATTENDING: <br />X R.G. Andersen-Wyckoff <br /> Bill Annen <br />X Ron Bakker <br />X Dan Berrey <br />X Byron Courts <br />X Randy Curtis <br /> Mike Hayford <br />X Dave Hays <br />X Craig Lewis <br />X Leonard Lodder <br /> Bob McCune <br />X Curt Pence <br />X Dan Petrusich <br />X Kathleen Thorpe <br />X John Whittington <br />Salem Area Transit <br />Century West - Environmental <br />Melvin Mark Development Co. <br />Prudential <br />Melvin Mazk Development Co. <br />Marion County <br />Century West - Structural <br />Pence / Kelly Construction <br />Melvin Mark Development Co. <br />Arbuckle Costic Architects <br />Marion County <br />Pence / Kelly Construction <br />Melvin Mark Development Co. <br />Century West - Environmental <br />Salem Area Transit <br />SCHEDULE <br />7-24 7-10 The team needs to focus on the elimination of P-2. Leonard's preliminary layout <br />indicates that expanding pazking under sidewalk is the prefened approach. ;Rev. 7-17 <br />Dave estimated that the removal of P-2 reduce schedule between two and fqur weeks. <br />ACTION: Dave will prepare schedule reflecting the removal of P-2 by 7/2~8. . Rev. 7- <br />24 Pence / Kelly indicated that approximately two months can be trimm~d from the <br />construction schedule by eliminating the P-21eve1 <br />BUDGET <br />7-24 Leonard proposed upsizing the 10" existing line with a 16" drain using urb~xi renewal <br />funds. <br />7-24 Does the building require waterproofing under P-1? ACTION: Leonard tq check w/ <br />Geotech to determine whether waterproofing is necessary (Potential $200,Op0 savings). <br />7-10 MMDC, Marion County and Transit need some indication on the status of the budget. <br />Although the plans are not at 100 %, it should be possible to set budget par~meters and <br />make assumptions to establish a benchmark budget. MMDC urged the team to work <br />towards this end. ACTION: MMDC to work with Leonard and Dave to define building <br />
The URL can be used to link to this page
Your browser does not support the video tag.