My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMORANDUM <br />~ TO: Dan Petrusich <br /> FROM: Rick Williams <br /> DATE: July 30, 1997 <br /> RE: Courthouse Square Parking Options (REVISED) <br /> Some numbers/recommendations regarding maximizing parking at both the existing Courthouse Square <br /> Garage and two scenarios for Pl. <br /> Courthouse Gara~e (Scenario 11 NE <br /> Existing Striped Stalls 174 <br /> New stalls with Walker re-stripe 15 (@ 25% compact) <br /> Sub-Total Stalls Available 189 <br /> Minimum "Float" Available (@ 15%) 28 <br /> Total Stalls Available (managed) 217 +43 <br /> Courthouse Garage (Scenario 2) . <br /> Existing Striped Stalls 174 <br /> New stalls with Walker re-stripe 25 (@ 62% compact) <br /> Sub-Total Stalls Available 199 <br /> Minimum "Float" Available (@ 15%) 30 <br />~ Total Stal/s Available (managed) 229 +SS <br /> Pl Garage (Scenario 1) <br /> Proposed Striped Stalls 324 <br /> Minimum "Float" Available (@ 15%) 48 <br /> Total Sta[Is Available (managed) 372 +48 <br /> P2 Garage (Scenario 2) <br /> Proposed Striped Stalls 369 <br /> Minimum "Float" Available (@ 15%) 55 <br /> Tota[ StaUs Available (managed) 424 +55 <br /> When you combine some of these scenari os you get: <br /> Space potential Total Net <br /> Courthouse Garage (Scenario 1) 217 +43 <br /> Pl Garage (Scenario 1) 372 +48 <br /> TOTAL 589 +91 <br /> Courthouse Garage (Scenario 2) 229 +55 <br /> P1 Garage (Scenario 2) 424 +55 <br /> TOTAL 653 +110 ' <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.