Laserfiche WebLink
~ ~ ~ ~ ~ ~ A ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />_ <br /> <br />Courthouse Square - - - --_ - -- ------ -- - --- <br />---. <br />Architectural Cost Consultants <br />LLC <br />_ <br />__------ <br /> <br />Court & High Street , <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, <br />AIA Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Salem, Oregon <br />Arbuckle Costic Architects <br />Inc 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />, <br />Design Development Probable Cost Estimate Portland, Oregon 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 <br />- - -- <br /> <br />- <br /> <br />- Print Time: 12:04 PM <br />Construction Start: Spri~99 <br />___ <br />_ - <br />- _ _ <br />~Alternates <br />~ Quantity _ _ <br />_ Unit _ _ __ <br />CosUUnit <br />- - - - _ - - - <br />- -- <br />Cost Total <br />-- --- <br />-- -- - <br />- - - - <br />Comments <br /> <br />1 Parkin~ Alternate 1 _ <br />_ <br /> <br />_ <br />_ <br />__ -- <br />-- - -- - <br />-__ _ _-_ <br />~ <br />_. <br /> <br />SITE WORK <br />_ _ _. _ _ <br />- - <br />-- <br />- _ _ _ <br /> <br />__ -- _ __ _ __ - - <br /> <br />- _ <br /> <br />__ - - <br />-- - - <br />_ <br />_ _ _ <br /> <br /> <br /> <br />torm Drainage System _ - <br />- --_ _ _ <br />- -- - - - - - <br /> <br />-- <br /> <br />-- <br /> <br />- <br />catch basins 2 ea 650.00 1,300 0 0 1 <br />300 <br />clean outs I 5 ea 450.00 2,250 0 0 , <br />2,250 <br />piping <br />underslab - 6" <br />" <br />238 <br />~ <br />If <br />30.00 <br />7,140 <br />0 <br />0 verify sizes <br />7 <br />140 <br />exposed 6 48 If 30.00 1,440 0 0 , <br />1 <br />440 <br />Building related earthwork , <br />temp. shoring @ perimeter <br />ki sf 0.00 0 0 0 0 NIC - assume not required <br />par <br />ng area 23,278 sf <br />mass excavation 8,621 cy 5.00 43,105 0 0 43 <br />105 <br />bank cut 457 cy 5.00 2,285 0 0 , <br />2 <br />285 <br />fill under slab <br />backfill against foundation 0 <br />721 cy <br />cy 7.00 <br />7 <br />00 0 <br />5 <br />047 0 0 , <br />0 w/ on site material <br /> <br />bus mall area @ sog <br />i <br />sf . , 0 0 5,047 w/ on site material <br />cut <br />fill 0 cy 5.00 0 0 0 0 <br /> <br />haul & dispose excess material off site (1,983) <br />7,816 cy <br />cy 7.00 <br />6 <br />00 (13,881) <br />46 <br />896 0 0 (13,881 w/ on site material <br /> <br />dewatering <br />, 1 <br />sum . <br />5,000.00 , <br />5,000 0 <br />0 0 <br />0 46,896 <br />5 <br />000 <br />structural (foundation) excavation i , <br />spread footings ~ 300 cy 15.00 4,500 0 0 4 <br />500 <br />continuous footing I 219 cy 15.00 3,281 0 0 , <br />3 <br />281 I <br />structural (foundation) backfill , <br />spread footings 180 cy 18.00 3,240 0 0 3 <br />240 <br />continuous footing 138 cy 18.00 2,479 0 0 , <br />2 <br />479 <br />haul 8~ dispose excess material off site 201 cy 6.00 1,206 0 0 , <br />1 <br />206 <br />level & grade <br />" 23,278 sf 0.10 2,328 0 0 , <br />2 <br />328 <br />4 <br />gravel under slab <br />vapor barrier 0 cy 13.00 0 0 0 , <br />0 w/ parking <br /> <br />2" sand under slab 0 <br />158 sf <br />cy 0.15 <br />25.00 0 <br />3,950 0 <br />0 0 <br />0 0 NIC <br />3 <br />950 <br />perimeter drain systcm , <br />6" pvc drain pipe 268 If 7.00 1,876 0 0 1 <br />876 <br />rock <br />filterfabric 120 <br />3,243 cy <br />sf 18.00 <br />0 <br />35 2,160 <br />1 <br />135 0 0 , <br />2,160 <br />~ <br />Subtotal <br />_ <br />f _ . , <br />- - - <br />$126,736 0 <br />$0 0 <br />$0 1135 <br />$126,736 <br />TOTAL - SITE WORK -- - - <br />~126,736 ----- <br />_ <br />a0 _ . <br />~0 ', <br />, <br />5126,736 5.44 I <br />_ - -- <br />Altemates - Page 1 <br />