Laserfiche WebLink
- _ _ _ _ _______- _- - __-_ <br />Courthouse Square Architectural Cost Consultants, LLC <br />ICoUIt & High St~2et James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />Salem, Oregon i 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />~Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 <br />Ground Level 23,249 <br />Second Floor 32,088 <br />Third Floor 32,088 <br />Fourth Floor 32,088 <br />I Fifth Floor 32,012 <br />Penthouse li ~,g~g <br />Total Gross Area 153,343 <br />Buildin~ Shell 8~ Core ~ Quantity Unit CosUUnit Cost Total <br />_ _ _ , - - _ _ <br />METALS - Continued <br />Miscellaneous metals <br />railings <br />stair center guardrail 311 If 50.00 15,550 <br />wall rail 528 If 28.00 14,784 <br />above bay windows (see elevations) 96 If 80.00 7,680 <br />balcony rail - top wall mtd @ lobby 19 If 45.00 855 <br />pit ladder 21.0 If 65.00 1,365 <br />perimeter wall ledger, support & kickers 4,060.0 If 30.00 121,800 <br />miscellaneous (embeds, angle, plate, etc, 153,343 sf 0.25 38,336 <br />Subtotal ~ <br />200,37a <br />_ _ <br />TOTAL - METALS _ _ _ _ _ <br />- <br />a27j~g2q <br /> <br />- - <br />WOOD & PLASTICS <br />_ _ <br />_ _ <br />_- ____ _ <br />_ _ _ - <br />-- ------- <br />Rough carpentry <br />miscellaneous blocking & backing 153,343 sf 0.35 53,670 <br />parapet backing 2,842 sf 1.85 5,258 <br />Subtotal 58,928 <br />Finish carpentry <br />chair rails @ corridors ~ 1,497 If 8.00 11,976 <br />wood cap @ 2nd flr balcony wall 19 If 15.00 285 <br />Subtotal ___ - _ _ _-- <br />12,261 <br />Casework <br />restrooms (2nd, 3rd, 4th & 5th flrs) <br />plam lav counter 64.0 If 95.00 6,080 <br />janitors closet (2nd, 3rd, 4th & 5th flrs) ' <br />shelving 54.0 If 84.00 4,536 <br />Subtotal ' <br />i - - - <br />10,616 <br />TOTAL - WOOD & PLASTICS a81,805 <br />0 0 0 0 <br />$o $o ao 30 <br />so~ so~ aoI so <br />-i _ -- _ _ --- --- _ _ <br />I Estimate Date: R21-Aug-98 <br />Document Date. 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />15,550 <br />1a,7aa <br />7,680 <br />855 <br />1,365 <br />121,800 <br />38,338 <br />200,370 <br />Comments <br />~277,624 _ . 1.81 <br />53,670 incls roof blocking <br />5,258 <br />asa,s2a <br />11,976 <br />285 <br />ao ao ao ao a~2.2s, <br />6,080 <br />$ol $o ao ao a~o,s~s o.o~ <br />So yo So So 581.805 0.53 <br />Building Shell & Core Detail Estimate - Page 6 <br />