- _ _ _ _ _______- _- - __-_
<br />Courthouse Square Architectural Cost Consultants, LLC
<br />ICoUIt & High St~2et James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />Salem, Oregon i 6441 SW Canyon Court, Suite 103
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221
<br />~Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187
<br />Ground Level 23,249
<br />Second Floor 32,088
<br />Third Floor 32,088
<br />Fourth Floor 32,088
<br />I Fifth Floor 32,012
<br />Penthouse li ~,g~g
<br />Total Gross Area 153,343
<br />Buildin~ Shell 8~ Core ~ Quantity Unit CosUUnit Cost Total
<br />_ _ _ , - - _ _
<br />METALS - Continued
<br />Miscellaneous metals
<br />railings
<br />stair center guardrail 311 If 50.00 15,550
<br />wall rail 528 If 28.00 14,784
<br />above bay windows (see elevations) 96 If 80.00 7,680
<br />balcony rail - top wall mtd @ lobby 19 If 45.00 855
<br />pit ladder 21.0 If 65.00 1,365
<br />perimeter wall ledger, support & kickers 4,060.0 If 30.00 121,800
<br />miscellaneous (embeds, angle, plate, etc, 153,343 sf 0.25 38,336
<br />Subtotal ~
<br />200,37a
<br />_ _
<br />TOTAL - METALS _ _ _ _ _
<br />-
<br />a27j~g2q
<br />
<br />- -
<br />WOOD & PLASTICS
<br />_ _
<br />_ _
<br />_- ____ _
<br />_ _ _ -
<br />-- -------
<br />Rough carpentry
<br />miscellaneous blocking & backing 153,343 sf 0.35 53,670
<br />parapet backing 2,842 sf 1.85 5,258
<br />Subtotal 58,928
<br />Finish carpentry
<br />chair rails @ corridors ~ 1,497 If 8.00 11,976
<br />wood cap @ 2nd flr balcony wall 19 If 15.00 285
<br />Subtotal ___ - _ _ _--
<br />12,261
<br />Casework
<br />restrooms (2nd, 3rd, 4th & 5th flrs)
<br />plam lav counter 64.0 If 95.00 6,080
<br />janitors closet (2nd, 3rd, 4th & 5th flrs) '
<br />shelving 54.0 If 84.00 4,536
<br />Subtotal '
<br />i - - -
<br />10,616
<br />TOTAL - WOOD & PLASTICS a81,805
<br />0 0 0 0
<br />$o $o ao 30
<br />so~ so~ aoI so
<br />-i _ -- _ _ --- --- _ _
<br />I Estimate Date: R21-Aug-98
<br />Document Date. 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />Construction Start: Spring 99
<br />15,550
<br />1a,7aa
<br />7,680
<br />855
<br />1,365
<br />121,800
<br />38,338
<br />200,370
<br />Comments
<br />~277,624 _ . 1.81
<br />53,670 incls roof blocking
<br />5,258
<br />asa,s2a
<br />11,976
<br />285
<br />ao ao ao ao a~2.2s,
<br />6,080
<br />$ol $o ao ao a~o,s~s o.o~
<br />So yo So So 581.805 0.53
<br />Building Shell & Core Detail Estimate - Page 6
<br />
|