|
jCourthouse Square
<br />~Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Ground Level
<br />Second Floor
<br />Third Floor
<br />Fourth Floor
<br />~ Fifth Floor
<br />Penthouse
<br />Total Gross Area
<br />Buildin~ Shell 8 Core
<br />CONCRETE
<br />Poured-in-place concrete
<br />forming
<br />spread footings
<br />i mat footing
<br />, continuous footing
<br />slab on grade
<br />columns
<br />~ parking level
<br />I building
<br />shear walls above parking level
<br />parking level
<br />' elevator pit
<br />beams
<br />i, supported slab
<br />; drop panel
<br />, curbs
<br />Subtotal - Forming
<br />reinforcing steel
<br />I spread footings
<br />I mat footing
<br />' continuous footing
<br />slab on grade
<br />I columns
<br />~ parking level
<br />building
<br />' shear walls above parking level
<br />parking level
<br />elevator pit
<br />~ beams
<br />, post tension
<br />I ds
<br />Architecturat Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />______
<br />23,249
<br />32, 088
<br />32,088
<br />32,088
<br />32,012
<br />1,818
<br />153, 343
<br />Quantity Unit CosUUnit Cost Total
<br />4,780 sf 4.85 2
<br />, 1,002 sf 5.50
<br /> sf 4.75
<br />
<br />I sf 0.50
<br />3,758 sf 5.75 2
<br />13,044 sf 5.75 7
<br />26,927 sf 5.35 14
<br />! 4,216 sf 5.35 2
<br />' 836 sf 5.35
<br />~ sf 6.50
<br />~ 154,284 sf 4.50 69
<br />' sf 7.25
<br />
<br />~I sf 6.50
<br />,
<br />' 43,150
<br />Ibs
<br />0.46
<br />1
<br />78,540 Ibs 0.46 3
<br /> Ibs 0.46
<br /> Ibs 0.50
<br />I
<br />I 27,227
<br />Ibs
<br />0.64
<br />1
<br />I 72,308 Ibs 0.64 4~
<br />i 106,040 Ibs 0.51 5
<br />' 16,600 Ibs 0.51
<br />3,449 Ibs 0.51
<br />', Ibs 3.50
<br />~ Ibs 0.55
<br />3,183 23, 7 83
<br />5,511 5,511
<br />0 o se
<br />0 o se
<br />1,609 21,609
<br />5,003 75,003
<br />4,060 144,080
<br />2,555 71,277 11,277 0
<br />4,473 a,a73
<br />~ 0 NI
<br />~,278 694,278
<br />~ o Nb
<br />0 p
<br />990,671 »,2~~ ~~,2n o o ssa,~~s
<br />~,849 ~ 9,8a9
<br />i,128 36,128
<br />0 o se
<br />0 o se
<br />',425 17,425
<br />i,277 46,277
<br />G,080 5a.080
<br />5,466 4,233 4,233 0
<br />I , 759 ~ ~ ,759
<br /> Mi
<br />0 ~ p
<br />~ ' o
<br />- - __ -
<br />Comments
<br />: parking estimate
<br />: parking estimate
<br />~ parking estimate
<br />: parking estimate
<br />Building Shell 8 Core Detail Estimate - Page 2
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />Estimate Date: R21-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />Construction Start: Sprin~ 99
<br />
|