Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />' Fifth Floor <br />Penthouse <br />Total Gross Area <br />Buildin~ Shell 8 Core <br />_ -- . <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Staniey J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />_ <br />---_-- <br />__ __ <br />23,249 <br />32,086 <br />32, 088 <br />32,088 <br />32,012 <br />1,818 <br />. 153,34: <br />__ __ - - - __ - - <br />Quantity Unit CosUUnit Cost Total <br />METALS - Continued <br />Miscellaneous metals <br />railings <br />i stair center guardrail 311 If 50.00 15,550 <br />wall rail 528 If 28.00 14,784 <br />above bay windows (see elevations) 96 If 80.00 7,680 <br />balcony rail - top wall mtd @ lobby 19 If 45.00 855 <br />pit ladder 21.0 If 65.00 1,365 <br />perimeter wall ledger, support & kickers 4,060.0 If 30.00 121,800 <br />miscellaneous (embeds, angle, plate, etc 153,343 sf 0.25 38,336 <br />i Subtotal <br />~ <br />I - --- - <br />200,370 <br />~ TOTAL - METALS <br />__ _ -- _ _ _. _ 5277,624 <br />I ---- _ .__ <br /> <br />WOOD & PLASTICS _ _ _ __ <br /> <br /> <br />_ --- <br />-- <br /> <br />- <br />-- - - --- <br /> <br />_ <br />-- -- --- <br /> <br />_ - -- <br />j Rough carpentry ~ <br />miscellaneous blocking & backing ~ 153,343 sf 0.35 53,670 <br />~ parapet backing 2,842 sf 1.85 5,258 <br /> <br />Subtotal <br />I ----_ -- --- <br />58,928 <br />'i Finish carpentry ; <br />' chair rails @ corridors I 1,497 If 8.00 11,976 <br />I wood cap @ 2nd flr balcony wall i 19 If 15.00 285 <br />i Subtotal i - - - -12,261 <br />Casework <br />restrooms (2nd, 3rd, 4th 8 5th flrs) <br />0 0 0 0 <br />ao - so ao ao <br />ao so ao ao <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />15,550 <br />14,784 <br />7,B90 <br />855 <br />1,365 <br />121,800 <br />38,338 <br />200,370 <br />_- - _ _ <br />_ Comments <br />3277.624 1.81 <br />- -- _ __ I <br />53,670 incls roof blocking I <br />5,258 ~ <br />558,928 <br />I 11,976 <br />285 <br />so ao ao so s,2,ss, <br />plam lav counter 64.0 If 95.00 6,080 6,080 <br />janitors closet (2nd, 3rd, 4th & 5th flrs) <br />shelving 54.0 If 84.00 4,536 a,536 <br />---- -_____ _.__ <br />ubtotal 10,616 $o go $o So 5~0,616 0.07 <br />~_ <br />_ - - <br />TOTAL - WOOD 8 PLASTICS ~81,805 ~o ~0 3o ao _ a87,8o5 0.53 <br />Building Shell 8 Core Detail Estimate - Page 6 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />