Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />Buildin~ Shell & Core <br />FINISHES - Continued <br />Ceramic Tile - Continued <br />base <br />type A <br />type E <br />wall tile <br />type A <br />type C <br />exterior @ grnd flr windows <br />Subtotal <br />Resilient <br />vct <br />rubber base <br />Subtotal <br />Carpet <br />type 4 <br />type 7 <br />type 8 <br />I Subtotal <br />~ Paint 8~ wallcoverings <br />sealed conc. floor <br />I transformer room <br />tenant areas <br />I retail area <br />penthouse <br />paint / finish door & frame <br />paint / finish relite frame <br />paint gypboard ceilings <br />paint fascia <br />paint exterior soffits <br />_ - --- <br />Architectural Cost Consuttants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />- ____ _ _ <br />_ -- - _ _ <br />23,249 - __ _ <br />32,088 <br />32,088 <br />32,088 <br />32,012 <br />1,818 <br />- <br />153, C <br />_ __ _ <br />_ _ - ---- <br />Quantity Unit CosUUnit Cost Total <br />_ _-- <br />~ _ _ . _- <br />564 If 12.00 6, 768 <br />584 If 10.75 6,278 <br />2,602 sf 8.50 22,117 <br />1,021 sf 45.00 45,945 <br />674 sf 10.00 6,740 <br />130,649 <br />2,506 sf 1.75 4,386 <br />2,679 If 1.50 4,019 <br />- - - __ <br />8,404 <br />23.8 sy 42.00 1,000 <br />84.0 sy 36.00 3,024 <br />459.2 sy 18.65 8,564 <br />_ _- -- _ <br />12,588 <br />722 sf 0.35 253 <br />108,816 sf 0.35 38,086 <br />3,582 sf 0.50 1,791 <br />1,692 sf 0.35 592 <br />113 ea 60.00 6,780 <br />25 ea 40.00 1,000 <br />4,784 sf 0.60 2,870 <br />108 sf 0.65 70 <br />10,266 sf 0.65 6,673 <br />253 <br />38,086 <br />1,791 <br />592 <br />B,780 <br />~,000 <br />2,870 <br />70 <br />6.673 j <br />___ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />- -- - <br />Comments <br />Building Shell & Core Detail Estimate - Page 12 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />0 0 0 0 <br />ao ao so $o <br />s,768 <br />6,278 <br />22,117 <br />45,945 <br />s,~a0 <br />130,649 <br />4,386 <br />4,019 <br />ae,aoa <br />1,000 <br />3,024 <br />8,564 <br />so so ao ao a~2,sas <br />