My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~^^ ~ ~ ~ ~ <br />~ e ~ ~ ~ ~ ~ ~ w <br />~ ~ ~ <br />_ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />_ _ _ <br />Courthouse Square I Architectural Cost Consultants, LLC <br />Court & High Street I James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 <br />Ground Level 23,249 <br />Second Floor 32,088 <br />Third Floor 32,088 <br />Fourth Floor 32,088 <br />Fifth Floor 32,012 <br /> 1 618 <br />- - _ <br />Total Gross Area 153,343 sf <br />' - --- _ _ _ _ _ . <br />Buildin~ Shell & Core I Quantity Unit CosUUrnt Cost Total ~ <br />_ _ _ __. <br />FURNISHINGS <br />Window treatment <br />@ relites & sidelites i 350 sf 3.00 1,050 <br />windows j 11,008 sf 3.00 33,024 <br />curtain wall ' 3,038 sf 3.00 9,114 <br />Subtotal 43,188 <br />Floor Mats & Frames <br />Walk-off mat 96 sf 30.00 <br />_ 2,880 <br />_- -- _ -- -- <br />Subtotal 2.880 <br />, <br /> <br />~~ TOTAL - FURNISHINGS , <br />_ <br />__ __ _ <br />._-- _ _ <br />~46,068 <br /> <br />SPECIAL CONSTRUCTION _ _ -_ <br />_ -- -- -._ _ - _ <br />I Item ~ sf 0.00 __ 0 <br />-- <br />~ Subtotal <br />- - - - _ -- _ <br />TOTAL - SPECIAL CONSTRUCTION <br />__ _ _ _ <br />Comments <br /> 1,050 <br /> 33,024 <br /> 9,»a <br />so so so ao us,, aa <br /> 2,sao <br />ao ao ao so a2,8ao <br />ao $o ao ao sas,os <br />verify <br />vestibule only <br />s 0.30 _ -- ~ <br />I - ~ <br />o ao $o so ao ao <br />~o so ao ao ao ao ___ <br />- -- . __ - -- ___ <br />I CONVEYING SYSTEMS <br />~ _ __ _ _ _ II - - _ _-- __-- - . __ . _ _ <br />Pssngr elevator 3000# geared - 350 fpm 15 stop 20,500.00 307,500 <br />Cab finishes ~ 3 ea 6,000.00 18,000 <br />premium for extended cab ht. ! 1 sum 1,800.00 1,800 <br />_ _ -_- _ __ <br />Subtotal I 327,300 <br />I ___ <br />TOTAL - CONVEYING SYSTEMS 5327,30a <br />~ 307,500 <br /> 18,000 <br /> 1,800 <br />ao so ao 3o as2~,aoo, <br />SO 30 SO $0 5327,300 <br />Building Shell & Core Detail Estimate - Page 15 <br />0.00 ___ l <br />2.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.