A ~ ~ ~ ~ ~
<br />Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Parking Level One
<br />Gross Area
<br />Parkin~ .
<br />~ ~ ~ w ~ ~ ~ ~ A ~ ~ ~ ~
<br />- _ _. _ _ _ __
<br />Architectural Cost Consultants, LLC Estimate ~ace: R2~-auy-ss
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Portland, Oregon 97221 Print Time: 11:20 AM
<br />Phone _(503) 297-7210 Fax (503) 297-7187 _ Construction StaR: Spnng 99
<br />_ __ _ - _
<br />__ _ _ ..
<br />70,793 .
<br />-- -
<br />-__ __ -
<br />70,793 sf
<br />_ . _ _ _ _ -- - --- - ---- - _- - -- - - _ _
<br />Quantity Unit CosUUnit Cost Total '~ Comments
<br />~ DEMOLITION
<br />i
<br />I remove utilities
<br />sanitary sewer
<br />storm
<br />water
<br />gas
<br />i hazardous material removal
<br />Subtotal
<br />_ _ __
<br />~ TOTAL - DEMOLITION
<br />__
<br />I SITE WORK
<br />Building related earthwork
<br />i temp. shoring @ perimeter
<br />parking area
<br />mass excavation
<br />I bank cut
<br />fill under slab
<br />backfill against foundation
<br />bus mall area @ sog
<br />~ cut
<br />'~ fill
<br />~ haul & dispose excess material off site
<br />' dewatering
<br />j elevator pit excavation
<br />~ structural (foundation) excavation
<br />j footings
<br />~ ramp wall
<br />~ structural (foundation) backfill
<br />f footings
<br />~, ramp wall
<br />haul & dispose excess material off site
<br />level & grade
<br />~ 4" gravel under slab
<br />~ vapor barrier
<br />370 If $6.00 $2,220
<br />340 If 6.00 2,040
<br />300 If 6.00 1,800
<br />370 If 6.00 2,220
<br /> sum 0.00 0
<br /> -- ---- ---- - . - -
<br />$8,280
<br />_ _ _ _
<br />_ __ ---
<br />__ - - -- - - _ _- -- - -- -
<br />----- -- ---58,280
<br /> 2,220
<br /> 2,040
<br /> 1,800
<br /> 2,220
<br /> 0
<br />$0 $0 $8,280
<br />$0 $0 $8,280
<br />'VIC - By Others (if required)
<br />0.12
<br /> sf 0.00 0 0 NIC - assume not required
<br />70,793 sf
<br />12,821 cy 5.00 64,105 64,105
<br />1,823 cy 5.00 9,115 9,115
<br />628 cy 7.00 4,396 4,396 w/ on site material
<br />3,039 cy 7.00 21,273 21,273 w/ on site material
<br />42,745 sf
<br />106 cy 5.00 530 530
<br />1,983 cy 7.00 13,881 13,881 w/ on site material
<br />9,100 cy 6.00 54,600 54,600
<br />1 sum 25,000.00 25,000 25,000
<br /> sum 0.00 0 0 NIC w/ building
<br />1,260 cy 15.00 18,900 18,900
<br />22 cy 15.00 324 324
<br />756 cy 18.00 13,608 13,608
<br />14 cy 18.00 245 245
<br />512 cy 6.00 3,072 ~ 3,072
<br />113,538 sf 0.10 11,354
<br />~ 11,354
<br />1,472 cy 13.00 19,136
<br />~ 19,136
<br />3,353 sf 0.15 503 I 503 @ strg rm & elevtr Ibby only
<br />Parking Detail Estimate - Page 1
<br />
|