<br />Courthouse Square ~
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc i
<br />Design Development Probable Cost Estimate
<br />Parking Level One
<br />Gross Area
<br />Parking ~
<br />ELECTRICAL ,
<br />~ basic materials & power distribution
<br />lighting
<br />100 watt hps 12" surface mtd
<br />fire alarm ~
<br />snow melting @ ramp
<br />Subtotal
<br />-- - _
<br />TOTAL - ELECTRICAL
<br />SUBTOTAL _ ~
<br />GENERAL CONDITIONS
<br />GENERAL CONTRACTOR FEE
<br />ESTIMATING CONTINGENCY
<br />I INDEX TO CONSTRUCTION START
<br />TOTAL DIRECT CONSTRUCTION COST
<br />Parkin~
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ A ~ ~
<br />__ _
<br />__ _ _
<br />_ _ _
<br />__
<br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />PoRland, Oregon 97221 Print Time: 11:20 AM
<br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 _
<br />. _ ----- -- - _ --- - -
<br />70,793
<br />- . _ ___ __
<br />_ _- -
<br />70,793 sf
<br />- ---- --- --
<br />_ _ - - ___ -- _- --- - _ ,
<br />Quantity Unit CosUUnit Cost Total Comments
<br />_____ - __ -- -~~~ I
<br />70,793 sf 0.75 53,095 53,095
<br />70 fixt 435.00 30,450
<br />70,793 sf 0.40 28,317
<br />2,254 sf 18.00 40,572
<br />-- -----
<br />152,434
<br />__ _ _
<br />- ___ _ _ --
<br />~152,434
<br />- -- - - --
<br />2,566,338 52,566,338
<br />7.75°~ 198,891
<br />3.75% 103,696
<br />4.50% 129,102
<br />Spring 99 0.75% 22,485 b454,174
<br />70,793 sf 542.67 /sf _ _ 53,020,512
<br />0
<br />30,450
<br />28,317
<br />0 0 152,434
<br />0 $0 $152,434 2.15
<br />399,374 399,374 1,767,590 $2,566,338 _
<br />30,951 30,951 136,988
<br />16,137 16,137 71,422
<br />20,091 20,091 88,920
<br />3,499 3,499 15,487 @ t 3% per year
<br />$470
<br />$3,020,512 _
<br />Parking Detail Estimate - Page 11