My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ s ~ r ~ ~ ~n w ~ ~ i ~ ~ ^i^~ ~ ^~ w w~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />CoUrt & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon ~ 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 _ Construdion Start: Spnng 99 <br />~Bus Mall ~ Quantity Unit CosbUnit Cost Total Comments ~ <br />DEMOLITION <br />~ demolition sf $0.00 $0 0 NIC - w/ parking & strtscape <br />hazardous material removal ~ sum 0.00 0 0 NIC - By Others (if required) <br />Subtotal $0 $0 $0 $0 <br />TOTAL - DEMOLITION SO $0 $0 $0 <br /> <br />~ SITE WORK _ _ _ --- _ __ - <br />I _ __ <br />Utilities _ ___ _ _ -- <br />~ storm drain system <br />catch basins 2 ea 650.00 1,300 1,300 <br />i clean outs 6 ea 450.00 2,700 2,700 <br />piping verify sizes <br />underslab - 6" 307 If 30.00 9,210 9,210 <br />~ exposed 6" 47 If 30.00 1,410 1,410 <br />~ oil / water separator 1 sum 8,000.00 8,000 8,000 <br />Subtotal $22,620 $0 $0 $22,620 <br />water system <br />water service for irrigation 1 sum 0.00 0 0 NIC <br /> <br />Subtotal _ _-_ -- <br />$0 <br />$0 <br />$0 <br />$0 <br />~~ electrical <br />' bus mall lighting <br />( 150 watt HPS 88 ea 600.00 52,800 52,800 <br />~ 250 watt HPS 32 ea 850.00 27,200 ~ 27,200 <br />'~ street lighting ea 0.00 0 0 NIC - see streetscape <br />traffic light sum 0.00 0 0 NIC - see streetscape <br />j pedestrian street light sum 0.00 0 0 NIC - see streetscape <br /> <br />Subtotal __- ---- - ---- -- <br />$80,000 <br />$0 <br />$0 <br />$80,000 <br />Landscaping <br />trees @ planters 11 ea 350.00 3,850 3,850 <br />color spots @ planters <br />I 11 ea 150.00 1,650 1,650 <br />I <br />~rn ation lanters ~ <br />~9 ~ @ P 11 ea 0.00 0 <br />, 0 NIC - By Others <br />~ <br />~ <br />Subtotal - ----- -- - <br />$5,500 <br />$0 <br />$0 <br />$5,500 <br />Bus Mall Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.