<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />[Bus Mall _
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />_
<br />_ _ __ _ _ _ - -- - - _ __ _ __ __ _
<br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />I Portland, Oregon 97221 Print Time: 1120 AM
<br />~ Phone (503) 297-7210 Fax (503) 297-7187 Constniction Start: Spring 99
<br />_ - - - - --
<br />~ Quantity Unit CosUUnit Cost Total Comments
<br />
<br />i
<br />I -
<br />;
<br />Gates / Fences / Overhead Grilles
<br /> securiry gate @ bridges (4 ea)
<br /> lifting towers 8.1 ton 3,000.00 24,394 24,394
<br /> truss & pipe frame 12,765 Ibs 1.65 21,062 2~.062
<br /> mesh panel 3,404 sf 12.00 40,848 40,848
<br /> operating / lifting mechanism for above 4 ea 35,000.00 140,000 140,000 verify
<br />~'~ security gates @ arcade entries ~ 1,080 sf 55.00 59,400 59,400
<br /> temp security fence @ nw crnr 42 If 15.00 630 630
<br />~ fence @ future development
<br />tem 312 If 15.00 4,680 4,680
<br /> p
<br />Subtotal _ - -- -- ___ --
<br />291,014
<br />0
<br />0
<br />291,014
<br /> Miscellaneous
<br />
<br />' bus mall canopy ~
<br />columns ~
<br />26.9 ton 3,000.00 80,784
<br />80,784
<br />12" dia. x-strong pipe
<br /> canopy framing 40.8 ton 3,000.00 122,472 122.4~2
<br /> misc bracing, cross bracing, cable, etc ~ 4.4 ton 2,500.00 11,010 11,010
<br /> I column tops 24.0 ea 350.00 8,400 8,400
<br /> gutters 614 If 12.00 7,368 ~.368
<br /> overhead glazing system 9,945 sf 27.30 271,499 271,499 price per Dea Mor
<br /> paint exposed steel 4,184 If 3.50 14,644 14,~
<br /> 1'/;' rod 1,296 If 1.75 2,268 2,268 i
<br /> pedestrian canopy ~
<br /> ' north arcade 1,440 sf 55.00 79,200 79,200
<br /> ' south building elevation 1,440 sf 55.00 79,200 79,200
<br /> north arcade
<br />precast concrete base
<br />896 sf 40.00 35,840
<br />3~.~~
<br /> 6" cmu backup 6,532 sf 8.50 55,522 55,522
<br /> brick veneer 4,276 sf 18.25 78,037 78,037
<br /> I soldiercourse 1,360 If 27.00 36,720 36,720
<br /> ~ steel framing ; 14.4 ton 3,000.00 43,146 43,146
<br /> parapet / top flashing / cap 1,384 sf 12.00 16,608 16,608
<br /> ' soffits/ceilings 1,384 sf 8.00 11,07 11,072
<br /> ,
<br />953
<br />789 0 0 953
<br />789
<br /> ! Subtotal , E ,
<br /> ~ TnTai - SITE WORK I 52,077,436 $0 _ _ _ _ $0 _ $2,077,436
<br />Bus Mall Detail Estimate - Page 3