|
~ ~ ~ ~ ~ ~
<br />Courthouse Square
<br />Court 8~ High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />(Streetscape
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />_ _ _ _ _ _-- _ _ . _ _. _ _ - - _ _ _
<br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Portland, Oregon 97221 Print Time: 1120 AM
<br />Phone (503) 297-7210 Fax (503) 297-7187 1 Construction Start: Spring 99
<br />_ _-- - - _ __.
<br />Quantity Unit CosUUnit Cost Total Comments
<br /> ~
<br />
<br />
<br />
<br />ITE WORK - Continued ~
<br />-_____
<br />
<br />--
<br />
<br />--
<br />
<br />_
<br /> ~
<br />Hardscape I
<br /> AC pavement
<br /> patch @ street 8,284 sf 1.85 15,325 15,325
<br /> pavement markings
<br /> restripe street 205 If 1.65 338 338
<br /> ~ parking stalls @ street 42 ea 3.00 126 126
<br /> I concrete pavement
<br /> 6" slab on grade, broom finish ~ 6,470 sf 4.00 25,880 25,880
<br /> 6" rat slab 27,250 sf 3.55 96,738 9B,738 see detail 3/A1.3.1
<br /> 2" exposed aggregate 12,873 sf 2.75 35,401 35,401
<br />~ 2" colored concrete 1,164 sf 2.90 3,376 3,376
<br /> waterproof inembrane ~ 925 sf 3.00 2,775 2,775
<br /> curb
<br /> curb & gutter 1,207 If 11.50 13,881 13,881
<br />I flush curb & gutter ' 424 If 10.00 4,240 4,240
<br />~ brick & tile pavers ~
<br />, 8" x 8" tile pavers ~ 10,547 sf 8.00 84,376 84,376
<br /> 4" x 8" brick paver trim @ above ~ 3,206 If 12.00 38,472 38,472
<br /> premium pavers @ highlite circles I 435 sf 15.00 6,525 6,525
<br /> brick paver trim @ above (circular) I 189 If 20.00 3,780 3,780
<br /> Subtotal 'I
<br />I _
<br />_
<br />$331,232 $0 $0 $331,232
<br />~I Street Fumiture
<br />I
<br />! benches, t 6'0" length ' 10 ea 900.00 9,000 9,000
<br /> I
<br />tree grates 48" x 48" 49 ea 750.00 36,750 36,750
<br /> I
<br />trash receptacles I 11 ea 1,000.00 11,000 11,000 verify qty
<br /> free standing planters ~, 0 ea 2,500.00 0 0 NIC
<br />~ bicycle racks '~, 4 ea 500.00 2,000 2,000 verify qty
<br /> telephone booths ~ 0 ea 0.00 0 0 NIC - By Others
<br /> mail boxes 0 ea 0.00 0 0 NIC - By Others
<br />~ banner brackets ~ 60 ea 350.00 21,000 21,000
<br />'~, banners j 60 ea 0.00 0 0 NIC - By Others
<br />'~ flagpole & base I 2 ea 3,000.00 6,000 6,000
<br />~, Subtotal '~ 85,750 0 0 85,750
<br />Streetscape Detail Estimate - Page 3
<br />
|