My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Fifth Floor <br />Transit <br />Solid Waste <br />Total Area <br />~ ~ ~ <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />- _ _----- _ _ _ __. <br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />10,918 <br />5,932 <br />16,850 sf sf <br />v <br />_ __ _ --- - - <br />METALS _ _ _ _ ---- <br />- ---- - _ ~ <br />Miscellaneous metals <br />miscellaneous 16,850 sf 0.07 <br />Subtotal <br />- <br />TOTAL - METALS _ _ _ - -___ <br />_ <br />WOOD & PLASTICS _ _ __ _ __ --- - <br />Rough carpentry <br />miscellaneous blocking & backing 16,850 sf 0.10 ___ <br />Subtotal <br />Finish carpentry ; <br />item j If 0.00 <br />Subtotal I <br />Casework I <br />reception <br />reception desk / counter 11.0 If 350.00 <br />shared conference I <br />base cabinet 10.0 If 185.00 <br />tran. conference <br />base cabinet 15.0 If 185.00 <br />break room <br />base cabinet 12.5 If 165.00 <br />wall cabinet 9.5 If 85.00 <br />layout / work <br />curved base cabinet 18.0 If 250.00 <br />repro <br />base cabinet 10.0 If 165.00 <br />wall cabinet 10.0 If 85.00 <br />wait <br />counter 8.0 If 350.00 <br />1,180 764 415 <br />1,180 0 764 415 <br />-- -- _ -- - - <br />a1,180 <br />$0 <br />$764 <br />$415 <br />0.07 <br /> <br /> <br /> <br />1,685 <br />1,092 <br />593 i <br />~ <br />I <br />-- _ __ _ __ <br />1,685 <br />0 0 1,092 593 ~ <br />i <br />II <br />0 0 0 0 <br />plastic laminate <br />3,850 <br />1,850 <br />2,775 <br />2,063 <br />808 <br />4,500 <br />1,650 <br />850 <br />2, 800 <br />3,850 <br />1,850 <br />2,775 <br />2,063 <br />808 <br />4,500 <br />1,650 <br />850 <br />2,800 <br />Fifth Floor Tenant Improvements Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.