|
_ _ __ _ - - --- ___ - __ __ _- _ ___ ___ -- _ _ - - _ -- - -
<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM
<br />Design Devefopment Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99
<br />Finn F~oor
<br />Transit ~ ~~918
<br />Solid Waste 5,932
<br />------- -- . - --- _ _ - -_ _ - --
<br />Total Area 16,850 sf sf
<br />_ _ _ - _ -- - - -- - - - -_ -
<br />Fifth Floor Tenant Finishes Quanti Unit CosUUnit Cost _ Total Comments
<br />- -- _ - - - -- -~ - -- - - -- - - -- - _ _ _ ----
<br />__ . _ , --- -- -__ _- - - ----- - ----_ _ ~ --~-----~ , ,
<br />FINISHES - Continued
<br />Gypsumboard Systems - Continued
<br />solid waste
<br />typical partitions
<br />furr columns
<br />acoustic @ above
<br />furring @ concrete wall
<br />suspended gypboard ceiling systems
<br />toilet room
<br />Subtotal
<br />Ceilings
<br />install ceiling grid & tiles
<br />solid waste
<br />transit expansion
<br />county expansion
<br />Subtotal
<br />Ceramic Tile
<br />floor tile
<br />type E
<br />base
<br />type F
<br />wall tile
<br />type F
<br />Subtotal
<br />Resilient
<br />vct
<br />@ solid waste
<br />j rubber base
<br />'I @ solid waste
<br />Subtotal
<br />5,590 sf 4.35 24,317 24,317
<br />378 sf 3.50 1,323 1,323
<br />2,795 sf 0.65 1,817 1,817
<br />270 sf 2.25 608 608
<br />322 sf 3.75 1,208 1,208
<br /> - 78,899 0 50,835 28,064
<br />10,224 sf 0.58 5,930 5,930
<br />5,700 sf 0.58 3,306 3,306
<br />2,145 sf 0.00 0 0 stock on floor for future
<br />8,625 sf 0.00 0 0 stock on floor for future
<br /> 9,236 0 5,930 3,306
<br />322 sf 9.75 3,140 3,140
<br />130 If 10.00 1,300 1,300
<br />496 sf 8.75 4,340 4,340
<br /> _ . _ _ 8,780 0 8,780 0
<br />374 sf 1.75 655 655
<br />300 sf 1.75 525 525
<br />2,078 If 1.50 3,117 3,117
<br />70 If 1.50 105 105
<br /> 4,402 0 3,772 630
<br />Fifth Floor Tenant Improvements Detail Estimate - Page 4
<br />_ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ _ ~ ~ ~ ~ ~ ~ ~
<br />
|