~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 12:04 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297_7187 Construction Start: Spring 99 <br />_ __ _ _ _ ~ <br />~Alternates ] Quantity Unit CosUUnit Cost Total Comments <br />_ __ _ - <br />- - - - - ---- <br />_ - -- -- -- --- - - <br />--- - ~ <br />1 Parkin~ Alternate 1 <br /> SITE WORK - - _ - - _ _ <br /> --- <br /> <br />Storm Drainage System _ __ _ _ _ _ - -- - - _ <br />- -- - _ _ <br />___ -- <br />- ----- <br />--- <br /> catch basins ' 2 ea 650.00 1,300 0 0 1,300 <br /> clean outs 5 ea 450.00 2,250 0 0 2,250 <br /> piping verify sizes <br /> underslab - 6" ~ 238 If 30.00 7,140 0 0 7,140 <br /> exposed 6" 48 If 30.00 1,440 0 0 1,440 <br /> Building related earthwork <br /> temp. shoring @ perimeter sf 0.00 0 0 0 0 NIC - assume not required <br /> parking area 23,278 sf <br /> mass excavation 8,621 cy 5.00 43,105 0 0 43,105 <br /> ' bank cut 457 cy 5.00 2,285 0 0 2,285 <br /> fill under slab 0 cy 7.00 0 0 0 0 w/ on site material <br /> backfill against foundation 721 cy 7.00 5,047 0 0 5,047 w/ on site material ~ <br /> j bus mall area @ sog sf ' <br /> cut 0 cy 5.00 0 0 0 0 <br /> fill (1,983) cy 7.00 (13,881) 0 0 (13,881 w/on site material <br /> haul & dispose excess material off site 7,816 cy 6.00 46,896 0 0 46,896 <br />, dewatering 1 sum 5,000.00 5,000 0 0 5,000 <br />i structural (foundation) excavation <br />i spread footings ! 300 cy 15.00 4,500 0 0 4,500 <br />~ continuous footing ~ 219 cy 15.00 3,281 0 0 3,281 <br /> structural (foundation) backfill <br /> spread footings 180 cy 18.00 3,240 0 0 3,240 I <br />~ continuous footing ~ 138 cy 18.00 2,479 0 0 2,479 <br />I <br /> haul & dispose excess material off site 201 cy 6.00 1,206 0 0 1,206 <br /> <br />~ level 8~ grade 23,278 sf 0.10 2,328 0 0 2,328 <br /> 4" gravel under slab 0 cy 13.00 0 0 0 0 w/ parking <br /> vapor barrier <br />~ 0 sf 0.15 0 0 0 0 NIC <br /> 2" sand under slab 158 cy 25.00 3,950 0 0 3,950 <br /> perimeter drain system <br /> 6" pvc drain pipe 268 If 7.00 1,876 0 0 1,876 <br /> rock 120 cy 18.00 2,160 0 0 2,160 <br /> filter fabric 3,243 sf 0.35 1,135 0 0 1 135 <br />' Subtotal $126,736 $0 $0 $126,736 <br /> <br /> TOTAL - SITE WORK a126,736 ~0 $0 ; b126,736 5.44 <br />Alternates - Page 1 <br />