My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />- <br />Courthouse Square ~ - -- - - - ---- <br />Architectural Cost Consultants, LLC _ __ _ __ _ _ _ _ . <br />Estimate Date: R21-Aug-98 <br /> Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br /> Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br /> Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM <br /> Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> - - --- - _ _ - - -- <br />i <br />C <br />t T <br />t <br />l <br />i <br />C <br />UU -- <br />mment <br />C <br />(Streetscape I Quant~ n <br />os <br />o <br />a <br />Un <br />t <br />os <br />t o <br />s <br /> <br />SUBTOTAL _. _ <br />~,403,29~ ~1,403,291 <br />-- --- -- --- -- - ------ <br />0 <br />0 <br />1,403,291 _ _ <br /> GENERAL CONDITIONS 7.75% 108,755 0 0 108,755 <br /> GENERAL CONTRACTOR FEE 3.75% 56,702 0 0 56,702 <br /> ESTIMATING CONTINGENCY 7.00% 109,812 0 0 109,812 <br /> INDEX TO CONSTRUCTION START <br />__ Spring 99 0.75% 12,589 $287,858 0 0 12,589 @ t 3°~ per year <br /> TOTAL DIRECT CONSTRUCTION COST <br /> Streetsca e <br />P _ _ _ _ 33,720 sf _ _ ~50.15/sf_ _ _ 51,691,150 $0 $0 $1,691,150 $1,691,150 <br />----- - - - --- <br />Streetscape Detail Estimate - Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.