Laserfiche WebLink
A ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />Courthouse Square <br />Court 8 High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />County <br />Transit <br />Conference Center <br />Total Area <br />Ground Levet Tenant Finishes <br />METALS <br />~ Miscellaneous metals <br />railings <br />wall rail <br />, miscellaneous (angle, ts, plate, etc.) <br />; Subtotal <br />i TOTAL - METALS <br />i WOOD 8 PLASTICS <br />~ - ----- --- - _ <br />~ Rough carpentry <br />miscellaneous blocking & backing <br />raised platform @ conf. center <br />Subtotal <br />Finish carpentry <br />chair rail <br />'I Subtotal <br />'~ Casework <br />, restrooms <br />i, plam lav counter <br />I shared <br />I bus waiting <br />4'0" dia island cabinet <br />information counter <br />information desk <br />~~ base cabinet <br />counter <br />i copy / work area <br />~ base cabinet <br />i wall cabinet <br />~ break room <br />; base cabinet <br />j wall cabinet <br /> Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br /> James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br /> 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br /> PoRland, Oregon 97221 Print Time: 11:42 AM <br /> Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> 2,532 <br /> 6,572 <br /> 4,826 <br /> --- - 13,930 sf <br /> <br />i - <br />i <br />U - - -- -- - --- <br />C <br />t T <br />l ' <br />C <br />UU - _ -- <br />C <br />Quant <br />ty n <br />t nit <br />os <br />os <br />ota omments <br />27 If 30.00 810 0 0 810 @ ramp <br />13,930 sf 0.25 3,483 633 1,643 1,207 <br /> 4,293 633 1,643 2,017 <br />-- --- - - -- - ------_ _ <br />~4,293 <br />$633 <br />$1,643 <br />$2,017 <br />0.31 <br /> <br /> <br />~ <br />13,930 <br />sf _ --- --- - <br />0.20 2,786 <br />506 <br />1,314 <br />965 <br />I 340 sf 15.00 5,100 <br />----- --- 0 0 5,100 , <br /> <br />, _ <br />_ <br />7,886 <br />5~ <br />1,314 <br />6,065 <br />~ 188 If 8.00 1,504 0 0 1,504 <br /> <br />I -- - <br />1, 504 <br />0 <br />0 <br />1,504 <br />~ 23.0 If 95.00 2,185 0 2,185 0 <br />', 21.0 If 95.00 1,995 0 0 1,995 <br />~ 1.0 sum 1,000.00 1,000 0 1,000 0 <br />~ <br />30.0 If 350.00 10,500 0 10,500 0 <br />I <br />~~ 6.0 If 350.00 2,100 0 2,100 0 <br />19.0 If 165.00 3,135 0 3,135 0 <br />j 27.0 <br />~ If 90.00 2,430 0 2,430 0 <br />' 9.0 If 165.00 1,485 0 1,485 0 <br />~, 9.0 If 85.00 765 0 765 0 <br />~ <br />10.0 <br />If <br />165.00 <br />1,650 <br />0 <br />1,650 <br />0 <br />' 7.0 If 85.00 595 0 595 0 <br />Ground Level Tenant Improvements Detail Estimate - Page 1 <br />