A ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />Courthouse Square
<br />Court 8 High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Ground Level
<br />County
<br />Transit
<br />Conference Center
<br />Total Area
<br />Ground Levet Tenant Finishes
<br />METALS
<br />~ Miscellaneous metals
<br />railings
<br />wall rail
<br />, miscellaneous (angle, ts, plate, etc.)
<br />; Subtotal
<br />i TOTAL - METALS
<br />i WOOD 8 PLASTICS
<br />~ - ----- --- - _
<br />~ Rough carpentry
<br />miscellaneous blocking & backing
<br />raised platform @ conf. center
<br />Subtotal
<br />Finish carpentry
<br />chair rail
<br />'I Subtotal
<br />'~ Casework
<br />, restrooms
<br />i, plam lav counter
<br />I shared
<br />I bus waiting
<br />4'0" dia island cabinet
<br />information counter
<br />information desk
<br />~~ base cabinet
<br />counter
<br />i copy / work area
<br />~ base cabinet
<br />i wall cabinet
<br />~ break room
<br />; base cabinet
<br />j wall cabinet
<br /> Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br /> James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br /> 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br /> PoRland, Oregon 97221 Print Time: 11:42 AM
<br /> Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99
<br /> 2,532
<br /> 6,572
<br /> 4,826
<br /> --- - 13,930 sf
<br />
<br />i -
<br />i
<br />U - - -- -- - ---
<br />C
<br />t T
<br />l '
<br />C
<br />UU - _ --
<br />C
<br />Quant
<br />ty n
<br />t nit
<br />os
<br />os
<br />ota omments
<br />27 If 30.00 810 0 0 810 @ ramp
<br />13,930 sf 0.25 3,483 633 1,643 1,207
<br /> 4,293 633 1,643 2,017
<br />-- --- - - -- - ------_ _
<br />~4,293
<br />$633
<br />$1,643
<br />$2,017
<br />0.31
<br />
<br />
<br />~
<br />13,930
<br />sf _ --- --- -
<br />0.20 2,786
<br />506
<br />1,314
<br />965
<br />I 340 sf 15.00 5,100
<br />----- --- 0 0 5,100 ,
<br />
<br />, _
<br />_
<br />7,886
<br />5~
<br />1,314
<br />6,065
<br />~ 188 If 8.00 1,504 0 0 1,504
<br />
<br />I -- -
<br />1, 504
<br />0
<br />0
<br />1,504
<br />~ 23.0 If 95.00 2,185 0 2,185 0
<br />', 21.0 If 95.00 1,995 0 0 1,995
<br />~ 1.0 sum 1,000.00 1,000 0 1,000 0
<br />~
<br />30.0 If 350.00 10,500 0 10,500 0
<br />I
<br />~~ 6.0 If 350.00 2,100 0 2,100 0
<br />19.0 If 165.00 3,135 0 3,135 0
<br />j 27.0
<br />~ If 90.00 2,430 0 2,430 0
<br />' 9.0 If 165.00 1,485 0 1,485 0
<br />~, 9.0 If 85.00 765 0 765 0
<br />~
<br />10.0
<br />If
<br />165.00
<br />1,650
<br />0
<br />1,650
<br />0
<br />' 7.0 If 85.00 595 0 595 0
<br />Ground Level Tenant Improvements Detail Estimate - Page 1
<br />
|