Laserfiche WebLink
~ <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br /> <br />Courthouse Square _ - _ _ - -- ---- - - - __ _. __ _ __ _ __ <br />Architectural Cost Consultants, LLC <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, A~A <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc ~ Portland, Oregon 97221 <br />Design Development Probable Cost Estimate ~ Phone (503) 297-7210 Fax (503) 297-7187 <br /> <br />I Ground Level _ ____ <br />23,249 <br />~ Second Floor 32,088 <br />~~ Third Floor 32,088 <br />Faurth Floor 32,088 <br />Fifth Floor 32,012 <br />Penthouse ~,8~$ <br />___. - - <br />Total Gross Area ! 153,3~ <br /> <br />Buildin~ Shell 8~ Core __ _ ____ <br />~ Quantity_ Unit CosUUnit Cost Total <br />DEMOUTION - - - - _ _ _ _ _- <br />demolition I sf $0.00 $0 <br />hazardous material removal ~ sum 0.00 0 <br />Subtotal I <br />- - --- 1 - - - __ _- _ _ _ <br />TOTAL - DEMOLITION <br />Comments ~ <br /> NIC - w/ parking 8 <br />NIC - By Others (if <br />$o so ao so ao ao <br />So ao ao ao $o ao o.oo <br />_ __ _ __ _ <br />i SITE WORK <br />'I Site <br />, waterproof inembrane top of slab <br />concrete pavement <br />~I 3" It weight concrete topping slab <br />~~ 3" exposed aggregate <br />3" colored concrete <br />5" broom finished <br />~ brick & tile pavers <br />8" x 8" tile pavers <br />4" x 8" brick paver trim @ above <br />premium pavers @ highlite circles <br />, brick paver trim @ above (circular) <br />~ Subtotal <br />i Building related earthwork <br />i elevator pit excavation <br />structural excavation <br />continuous footing <br />spread footings <br />I structural backfill <br />continuous footing <br />spread footings <br />miscellaneous underslab t & b <br />Subtotal <br />TOTAL - SITE WORK <br />7,063 sf 2.75 19,423 <br />7,063 sf 3.00 21,189 <br />3,052 sf 2.75 8,393 <br />578 sf 2.90 1,676 <br />865 sf 2.55 2,206 <br />1,522 sf 8.00 12,176 <br />796 If 12.00 9,552 <br />174 sf 15.00 2,610 <br />76 If 20.00 1,520 <br />1 sum 1,000.00 1,000 <br />0 cy 25.00 0 <br />1,746 cy 25.00 43,650 <br />0 cy 18.00 0 <br />873 cy 18.00 15,714 <br />1 sum 2,500.00 2,500 <br /> S <br /> <br /> verify slab se <br /> 19,a23 slab to allow f <br /> drains w/ finis <br /> 2~,~e9 pavers on top <br /> 8,393 slab <br /> 1,676 <br /> 2,206 <br /> 12,176 <br /> 9,552 <br /> 2,610 <br /> 1,520 <br />78,745 0 0 0 0 78,745 <br /> 1,000 <br /> 0 <br /> 0 <br /> 43,650 <br /> 0 <br /> 0 <br /> 15,714 <br /> 2,500 <br />~s2,8s4 so $o ao - ao --- as2,ssa <br />'41,609 30 SO So $0 3~4~,609 ~ <br />~ ~ ~ ~ ~ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />strtscape <br />required) <br />__ __- _~ <br />~ <br />ction. topping ', <br />or slope to <br />h slab or ' <br />of topping <br />).92 <br />Building Shell & Core Detail Estimate - Page 1 <br />