Laserfiche WebLink
_ - - -_ _ _ _ _----- -- ____ _----- - ----- - - - - - - ---- _- <br />jCourthouse Square j Architectural Cost Consultants, LLC ~ Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate I Phone (503) 297-7210 Fax (503) 297-7187_ Construction Start: Spring 99 <br />_ <br />Fourth Floor -_ _ _ __-- - -- <br />28,279 I - <br /> <br />Total Area _ _ - <br />28,279 sf <br />_ _. - --- -- -- --- --- _ _ _ _ _ _ - - <br />Fourth Floor Tenant Finishes Quantity Unit Cost/Unit Cost Total Comments <br />I _ _ _ - __ _ _ _ --- _ <br />WOOD & PLASTICS - Continued ~ <br />Casework - Continued <br />reception <br />counter i 27.0 If 275.00 7,425 <br />work / copy <br />base cabinet 11.0 If 165.00 1,815 <br />wall cabinet 11.0 If 85.00 935 <br />counter i 17.5 If 90.00 1,575 <br />island cabinet ~ 6.0 If 300.00 1,800 <br />toilet room <br />lav counter I 12.0 If 95.00 1,140 <br />allowance 28,279 sf 0.02 500 <br />_ _ _ -- <br />Subtotal i 500 <br />Caulking & Sealants ~ <br />caulking / sealants 28,279 sf 0.05 1,500 <br />- . _ --- <br />_ -- <br />Subtotal 1 1, 500 <br />TOTAL - MOISTURE - THERMAL CONTROL ~2,000 <br />7,425 <br />1,815 <br />935 <br />1,575 <br />1,800 <br />1,140 <br />26,705 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0.94 <br />1.04 <br />500 0 <br />500 <br />1,500 0 <br />0 <br />1,500 0 <br />2,000 $0 0.07 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 2 <br />~ ~ ~ ~ <br />