My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a ~ ^^~ ~^ s ~ ^i^^ ^~^ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />_ _ _ _ _ _ _ --- - <br />_ - -- -- ----- --- <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />Court 8~ High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297 7187 Construction Start: Spring 99 <br />_ _ <br />- --- - <br />' FifthFloor I -- ------- <br />Transit 10,918 <br />Solid Waste 5,932 <br />Total Area _ _ -- ---- - <br />__ __- ----- - <br />76,850 sf sf <br />-- - _ - -- --- - - <br />,, -- - --- __ _ <br />Fifth Floor Tenant Finishes Quantity Unit CosUUnit Cost Total ,~ Comments <br />- <br />METALS --_ _ __ - --- <br />_ - - __ _ I <br />Miscellaneous metals <br />miscellaneous 16,850 sf 0.07 1,180 <br />--- - - __ <br />Subtotal - <br />1,1 <br />___ _ _ __ <br />----- -- <br />; TOTAL - METALS 51,1 <br /> 764 415 <br />80 0 764 415 <br />80 _ $0 $764 $415 <br />- - _~ <br />0.07 <br />-- __- - - - <br />' WOOD - -- - _ _ - --- - -- -- ---- <br />& PLASTICS <br />__ _ _ _ - _ <br />_ _ - <br />__- <br /> <br />_--- -- - - - --___ _ - --- ~ <br />i <br />Rough carpentry <br />I _- <br />miscellaneous blocking 8~ backing I <br />~ 16,850 sf 0.10 1,685 1,092 593 <br />j Subtotal ' 1,685 0 1,092 593 <br />' Finish carpentry ~ <br />j item <br /> <br />' ~ <br />~ If 0.00 <br />-- 0 <br />--- --- _ _ _ _ <br />i <br />Subtotal 0 0 0 0 ' <br />Casework i <br /> <br />reception <br />~ plastic laminate <br />; <br />reception desk / counter <br />~ 11.0 If 350.00 3,850 3,850 <br />shared conference , <br />base cabinet 10.0 If 185.00 1,850 1,850 ~~ <br />~ tran. conference ; <br /> <br />I base cabinet <br />15.0 <br />If <br />185.00 <br />2,775 <br />2,775 ~~ <br /> <br />break room i <br />base cabinet 12.5 If 165.00 2,063 2,063 <br />wall cabinet 9.5 If 85.00 808 808 <br />layout / work <br />curved base cabinet 18.0 If 250.00 4,500 4,500 <br />repro <br /> <br />base cabinet <br />10.0 <br />If <br />165.00 <br />1,650 <br />1,650 I <br /> <br />~ wall cabinet <br />10.0 <br />If <br />85.00 <br />850 <br />850 I <br /> <br />'~ wait ~ <br />, <br />counter j 8.0 If 350.00 2,800 2,800 <br />Fifth Floor Tenant Improvements Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.