Project Analysis and Feasibility Report (2)
>
CS_Courthouse Square
>
Project Analysis and Feasibility Report (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:44:22 PM
Creation date
9/6/2011 10:43:49 AM
Metadata
Fields
Template:
Building
RecordID
10308
Title
Project Analysis and Feasibility Report
Company
Gardiner & Glancy LLC
BLDG Date
7/1/1996
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Risks/OptionsNariables: <br />The Proforma contains some risks and variables that are noteworthy. They includ~: <br />1. Construction estimates are tentative and subject to final design and competi ive bidding. <br />2. Utility and labor costs may exceed estimates over the next two years. <br />3. Interest rates may climb prior to obtaining final financing. <br />4. Demand for class A& B office space may drop resulting in higher vacancy rates and <br />longer leasing time. <br />5. The amount of parking required/desired, including the 59 above ground sp es, and the <br />associated cost has not been finalized. <br />6. Costs associated with remodeling of the Franklin Building and Courthouse ave been <br />estimated but, are not included as a Courthouse Square expense. <br />7. A change in the cost sharing forniula between transit and the county could hift actual <br />expenses. (There are currently two formulas which aze based on the origin I design). <br />8. A change in Salem's Streetscape funding could alter cost estimates to com ete the <br />project. <br />9. Until such time as a private partner is selected to develop the north pad, the financial <br />impacts on the total project are unknown. Once SPOC gives it's approval t the project, <br />an RFP could be issued. <br />10 Addirional environmental cleanup costs may be incurred during the <br />Opportunities: <br />phase. <br />There are several options under consideration that can minimize risks noted above. In addition, <br />these options have the potential to reduce the service impact of the higher project r nts. They <br />include: <br />1. The project contingency fund is $3.6 million. A reduction in the actual use of the project <br />contingency has the potential to reduce the rental rate by up to $0.10 /sf or ore. <br />2. Profits generated from commercial leases in the Franklin Bldg. and Courth use Square <br />could be used to offset assessments to county departments. <br />3. The ability to invest in quality and energy efficient building systems can r uce long term <br />maintenance costs. <br />The proforma represents a best guess estimate of expenses for a building which is t least two <br />years from occupancy and still must undergo detailed design review and constructi n bidding. It <br />does not take into account the benefits or impacts that private development of the orth pad will <br />have on the project. Subject to the risks and variables noted above, we believe all relevant data <br />and costs have been identified The county must rely on its consultants to constan y review and <br />update these projections as the project proceeds. <br />3 <br />