Laserfiche WebLink
Courthouse Square .~rchitectural Cost Consultants, LLC <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />__ ~....,.~,..,...e.,~ o~β€žti te Phone (503) 297-7210 Fax (503) 297-7187 <br />~ ~~ <br />ECT CONSTRUCTION COST SUMMARY <br />~ <br />~ <br />Component Area $ / SF Cost <br />Building Shell & Core 153,343 sf 73.37 11,251,254 <br />Parking 70,793 sf 42.74 3,025,505 <br />Subtotal 22a,136 sf 63.70 $14,276,759 <br />Streetscape 33,720 sf 50.20 1,692,690 <br />Bus Mall 66,528 sf 37.29 2,480,768 <br />Subtotal 1oo,2a8 sf 41.63 $4,173,458 <br /> Tenant Finishes <br />Ground Levet Tenant Finishes <br />13,930 sf <br />42.12 <br />586,780 <br /> Second Floor Tenant Finishes 27,552 sf 17.49 481,994 <br /> Third Floor Tenant Finishes 28,279 sf 24.66 697,318 <br /> Fourth Floor Tenant Finishes 28,279 sf 21.02 594,396 <br /> Tenant Finishes <br />Fifth Fl 850 sf <br />16 31.11 524,203 <br /> oor , 691 <br />884 <br />$2 <br />~ 114,890 sf 25.11 , <br />, <br />TOTAL DIRECT CONSTRUCTION COST 521,334,908 <br />0 <br />Indicated Surplus / (Deficit) (21,334,908) <br />ALTERNATES <br />1 Parking Altemate 1 23,278 sf Add t 932,100 <br />2 Parking Altemate 2 19,467 sf Add t 686,200 <br />0 <br />30 ~ <br />40 <br />Estimate Date: R18-Aug-98 <br />Document Date: 23-Jui-98 <br />Print Date: 1&Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Spring 99 <br />Comments <br />The above estimates are for direct construction cost only. They do not include fumishings & equipment, consultant <br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any <br />other normally associated development costs. <br />The above estimates assume a competitivety bid project, with at least three qualified bidders in each of the major <br />sub-trades as well as the general contractors. All work to be contracted at one time (shell & core, street & bus mall and <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The above es6mates assume a construction start date of: Spring 99 If the start of construction is delayed <br />beyond the date above, the estimates must be indexed at a rate of 4-6°~ per year compounded. <br />~ <br />Summary - Page 1 <br />