<br />..:
<br />,Courthouse Square .
<br />Architectural Cost Consultants, LLC
<br />Estimate Date: R18-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />Arbudcle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM
<br />Desi n Develo ment Probable Cost Estimate Phone 503 297-7210 Fax 503 297-7187 Construction Start: Spring 99
<br />
<br />Ground Level 23,249
<br />Second Floor 32,088
<br />Third Floor D ~~~ 32,088
<br />rth Floor 32,088
<br />F
<br />ou
<br />F'dth Floor 32,012
<br />Penthouse ~ ~81 e
<br />Total Gross Area 153,343 sf
<br />Buildin Shell 8~ Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />DOORS, WINDOWS & GLASS
<br />
<br />Doors, Frames & Hardware (incls. installat on)
<br />exterior
<br />entry doors 3 pair 2,800.00 8,400 8,aoo
<br />automatic opener 2 pair 3,500.00 7,000 ~,000
<br />transit & county entry 4 ea 1,200.00 4,800 ;~,800
<br />automatic doors 1 pair 10,000.00 10,000 ~0,000'
<br />retail entry 3 ea 1,200.00 3,600 3,600
<br />pair 1 pair 2,800.00 2,800 2,800
<br />'
<br />stair egress 1 pair 2,600.00 2,600 2,600
<br />penthouse, transformer, mech 6 ea 850.00 5,100 5;100
<br />interior doors
<br />1 st flr tobby 4 pair 2,800.00 11,200 ~ ~,200
<br />tenant entry 36 ea 900.00 32,400 32.aoo
<br />pair 4 pair 1,975.00 7,900 7,soo
<br />restroom 8 ea 700.00 5,600 5,600
<br />janitor rooms
<br />utility 25 ea 750.00 18,750 18,~50
<br />,
<br />stair 11 pair 2,600.00 28,600 28,600
<br />penthouse 2 ea 775.00 1,550 1,550
<br />Subtotal 150,300 0 0 ' 0 o t5o,3o0
<br />Relites, Sidelites & Transoms
<br />main lobby transom 96 sf 30.00 2,880 2~880
<br />main lobby @ 2nd floor 80 sf 30.00 2,400 2,400' verify plan vs sctn & elvtn
<br />@ tenant entries
<br />"
<br />'
<br />"
<br />2nd 8 ea 430.00 3,440 3,4ao assume 7'2
<br />x 2
<br />0
<br />3rd 6 ea 430.00 2,580 2,58o assume 7'2" x 2'0"
<br />4th 5 ea 430.00 2,150 2,150' assume 7'2" x 2'0"
<br />5th 6 ea 430.00 2,580 2,58o assume 7'2" x 2'0"
<br />Subtotal 16,030 0 0 0 0 ~s,o3o
<br />Building Shell & Core Detail Estimate - Page 9