Laserfiche WebLink
~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Architectural Cost Consultants, LLC <br />James A. Jercle, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Spring 99 <br />Paricing Level One <br />Gross Area 70,793 <br />70,793 sf <br />Parkin Quantity Unit CosUUnit Cost Total Comments <br /> <br />CONCRETE - Continued I <br />reinforcing steel <br />spread footings 12,149 Ibs 0.46 5,588 5,5$8' <br />continuous footing 33,579 Ibs 0.46 15,446 1~,446' <br />slab on grade 0 Ibs 0.50 0 0' NIC - per struct dtl. (fiberme <br />columns 13,230 Ibs 0.60 7,938 '7,938 <br />walls <br />basement 82,793 Ibs 0.48 39,740 39,740' <br />ramp wall 5,796 Ibs 0.48 2,782 2,782 <br />beams NIC <br />post tension Ibs 3.50 0 0' <br />r/s Ibs 0.55 0 0 <br />supported slab <br />post tension (unbonded) 92,085 Ibs 1.90 174,962 ' 87,4$1 $~,481' 0 <br />Ns 130,725 Ibs 0.48 62,748 31,374 31,374 0 <br />parking ramp <br />post tension (unbonded) 2,966 Ibs 1.90 5,636 5,636 <br />r/s 4,751 Ibs 0.48 2,281 2,281 <br />curbs Ibs 0.55 0 0 NIC <br />mesh @ concrete topping slab <br />3" @ drive lane 15,792 sf 0.55 8,685 8,685 <br />3" It weight 27,201 sf 0.55 14,960 14,960 <br />3" @ building plaza 8,787 sf 0.55 4,833 4,833 <br />Subtotal - Reinforcing Steel 345,600 ''118,555 1?8,855 107,890 <br />placing <br />spread footings 175 cy 18.00 3,150 3,150 <br />continuous footing 329 cy 17.00 5,593 5,593 <br />ramp wall 8 cy 17.00 136 136 <br />slab on grade 917 cy 16.00 14,672 14;672 <br />columns 22 cy 32.00 704 704 <br />walls <br />basement 393 cy 28.00 11,004 11,004 <br />ramp wall 24 cy 28.00 672 672 <br />Parking Detail Estimate - Page 3 <br />