Laserfiche WebLink
~ ~ ~ <br />Courthouse Square <br />Court 8~ High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 1 S-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Spring 99 <br /> <br />Paricing Level One <br />Gross Area 70,793 <br />70,793 sf <br />Parkin Quanti Unit CosUUnit Cost Total Comments <br /> <br />CONCRETE - Continued <br />finishing <br />set screeds <br />cure <br />seal <br />trowel <br />float slab <br />185,895 sf 0.20 37,179 <br />185,895 sf 0.08 14,872 <br />185,895 sf 0.06 11,154 <br />113,538 sf 0.60 68,123 <br />72,357 sf 0.40 28,943 <br /> <br /> <br /> <br /> <br />4,471 <br /> <br /> <br /> <br /> <br />l4,d71 <br />37,179 <br />14,872' <br />11,154 <br />68,123' <br />0' <br />finish topping slabs <br />3" @ drive lane <br />3"Itweight <br />3" @ building plaza <br />float footings <br />break ties & plug voids @ walls <br />14,356 sf 0.45 6,460 <br />24,728 sf 0.45 11,128 <br />7,988 sf 0.45 3,595 <br />2,660 sf 0.40 1,064 <br />25,705 sf 0.55 14,138 <br />6,460 <br />11,1Z8 <br />3,595'' <br />1;064 <br />14,138 <br /> <br />~ <br />Subtotal 196,654 ' 14,4?1 14,47t ' 167,711' <br />Miscellaneous <br />waterstop <br />house keeping pads <br />1,116 If 4.50 5,022 <br />300 sf 8.00 2,400 <br />5,022 <br />2,400 <br />Subtotal 7,422 0 0 7,422 <br />Precast Concrete <br />precast wheel stops <br />192 ea 0.00 0 <br />0 <br />NIC <br />Subtotal 0 '0 0 0 <br />TOTAL- CONCRETE a1,590,897 $400,41'5 $40Q415 ' $79a,066 22.47 <br /> <br />MASONRY <br /> <br />Concrete Masonry Units (CMU) <br />6" partitions <br />north ramp wall (for veneer backup) <br />4,910 sf 8.50 41,735 <br />1,080 sf 8.50 9,180 <br />~''1,735 <br />9,180 <br />storage & lobby walls <br />verify <br />Subtotal 50,915 0 0 ' SQ,915 <br />TOTAL - MASONRY ~50,915 $0 $Q- $50,91'S 0.72 <br />Parking Detail Estimate - Page 5 <br />