Laserfiche WebLink
~ <br />rthouse Square <br />t & High Street <br />i, Oregon <br />kle Costic Architects, Inc <br />n Develooment Probable Cost Estimate <br />Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Portland, Oregon 97221 Print Time: 05:44 PM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Streetscape Quanti Unit CosUUnit Cost Total Comments <br />Canopies <br />east building elevation <br />312 sf 55.00 17,160 <br />17,160 <br />west building elevation 132 sf 55.00 7,260 7,260' <br />south main entry 312 sf 75.00 23,400 ~~~~Q~ <br />south building elevation 1,260 sf 55.00 69,300 69,30d <br />southwest pavilion (grid A13) 144 sf 55.00 7,920 ~,920 <br />pavilion (grid A10) 96 sf 55.00 5,280 5,280 <br />clock tower 32 sf 55.00 1,760 ~'.~~~ <br />pavilion (grid A3) 96 sf 55.00 5,280 ~~2$~ <br />' <br />northwest pavilion (grid A1) 0 sf 55.00 0 ° 0' NIC - future <br />Subtotal 137,360 0 0 ' 137,360 <br />Bridges <br />steel framing <br />9.7 ton 3,000.00 29,160 <br />29,160 <br />metal decking 2,900 sf 2.75 7,975 7,9~5 <br />paint / finish exposed steel 3,268 If 3.50 11,438 11,438 <br />soffit - paint exposed decking 2,900 sf 1.00 2,900 ~.9~~ <br />utters 80 If 8.00 640 ~~ <br />g <br />Subtotal 52,113 0 0 52,113 <br />Arcades / Pavilions / Clock Towers <br />precastconcretebase 1,428 sf 40.00 57,120 57,120 <br />6" cmu backup 9,160 sf 8.50 77,861 77,861 <br />' <br />brick veneer 5,112 sf 18.50 94,572 94,5 <br />~2 <br />soldier course 796 If 27.00 21,492 21,4$2 <br />steel framing 10.2 tons 3,000.00 30,723 3Q.723 <br />metal decking 2,156.0 sf 3.00 6,468 6,468 <br />membrane roofing 2,156 sf 5.00 10,780 10,780 <br />metal panel 2,090 sf 35.00 73,150 73,150 <br />parapet coping 560 If 18.00 10,080 10,080 <br />so <br />roof trellis @ clock towers <br />1,144 sf 35.00 40,040 <br />4a,040 <br />clock faces 2 ea 10,000.00 20,000 Zb,000 <br />' allowance <br />aint exposed steel 1 sum 3,000.00 3,000 3,000 <br />p <br />Subtotal 462,534 Q 0 462,534 <br />~ <br />TOTAL - SITE WORK __ 31,379,215 $0 $0 $1,37$,2'[5' - _ _ _ <br />Streetscape Detail Estimate - Page 4 <br />