Laserfiche WebLink
~ __ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court 8~ High Street James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 06:13 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Bus Mall Quanti Unit CosUUnit Cost Total Comments <br />SITE WORK - Continued <br />Gates / Fences / Overhead Grilles <br />security gate @ bridges (4 ea) <br />lifting towers 8.1 ton 3,000.00 24,394 24,394' <br />truss & pipe frame 12,765 Ibs 1.65 21,062 2~ ~~62 <br />mesh panel 3,404 sf 12.00 40,848 ~~.~~ <br />operating / lifting mechanism for above 4 ea 30,000.00 120,000 12~,00~1 <br />' verify <br />security gates @ arcade entries 1,080 sf 55.00 59,400 59,400 <br />temp security fence @ nw cmr 42 If 15.00 630 630 <br />fence @ future development <br />tem 312 If 15.00 4,680 ' 4,680~-~ <br />p <br />Subtotal 271,014 0 0 271',014 <br />Miscellaneous <br />bus ma~l canopy <br />columns ~ <br />26.9 <br />ton <br />3,000.00 <br />80,784 <br />80,784 <br />12" dia. x-strong pipe <br />canopy framing 40.8 ton 3,000.00 122,472 ~ 22,4~2' <br />misc bracing, cross bracing, cable, etc 4.4 ton 2,500.00 11,010 11,010 <br />column tops 24.0 ea 350.00 8,400 8,400 <br />gutters 614 If 12.00 7,368 7,368 <br />overhead glazing system 9,945 sf 27.30 271,499 271,499 price per Dea Mor <br />paint exposed steel 4,184 If 3.50 14,644 14,644 <br />1%:' rod 1,296 If 1.75 2,268 2,268 <br />pedestrian canopy <br />north arcade <br />1,440 <br />sf <br />55.00 <br />79,200 <br />79,200 ' <br />south building elevation 1,440 sf 55.00 79,200 79,20~ <br />north arcade <br />precast concrete base <br />896 <br />sf <br />40.00 <br />35,840 <br />35,840 <br />6" cmu backup 6,532 sf 8.50 55,522 55,522 <br />brick veneer 4,276 sf 18.50 79,106 79,1-06 <br />soldier course <br />steel framing <br />14.4 <br />ton • <br />3,000.00 ~ <br />43,146 ~ <br />43,146 <br />parapet / top flashing / cap 1,384 sf 12.00 16,608 16,608 <br />soffits / ceilings 1,384 sf 8.00 11,072 11,072 <br />Subtotal 954,858 0 0 954,858 <br />TOTAL - SITE WORK 52,058,505 $0 $0 $2,058,505 <br />Bus Mall Detail Estimate - Page 3 <br />