<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98
<br />Court 8~ High Street James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 06:13 PM
<br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99
<br />Bus Mall Quanti Unit CosUUnit Cost Total Comments
<br />SITE WORK - Continued
<br />Gates / Fences / Overhead Grilles
<br />security gate @ bridges (4 ea)
<br />lifting towers 8.1 ton 3,000.00 24,394 24,394'
<br />truss & pipe frame 12,765 Ibs 1.65 21,062 2~ ~~62
<br />mesh panel 3,404 sf 12.00 40,848 ~~.~~
<br />operating / lifting mechanism for above 4 ea 30,000.00 120,000 12~,00~1
<br />' verify
<br />security gates @ arcade entries 1,080 sf 55.00 59,400 59,400
<br />temp security fence @ nw cmr 42 If 15.00 630 630
<br />fence @ future development
<br />tem 312 If 15.00 4,680 ' 4,680~-~
<br />p
<br />Subtotal 271,014 0 0 271',014
<br />Miscellaneous
<br />bus ma~l canopy
<br />columns ~
<br />26.9
<br />ton
<br />3,000.00
<br />80,784
<br />80,784
<br />12" dia. x-strong pipe
<br />canopy framing 40.8 ton 3,000.00 122,472 ~ 22,4~2'
<br />misc bracing, cross bracing, cable, etc 4.4 ton 2,500.00 11,010 11,010
<br />column tops 24.0 ea 350.00 8,400 8,400
<br />gutters 614 If 12.00 7,368 7,368
<br />overhead glazing system 9,945 sf 27.30 271,499 271,499 price per Dea Mor
<br />paint exposed steel 4,184 If 3.50 14,644 14,644
<br />1%:' rod 1,296 If 1.75 2,268 2,268
<br />pedestrian canopy
<br />north arcade
<br />1,440
<br />sf
<br />55.00
<br />79,200
<br />79,200 '
<br />south building elevation 1,440 sf 55.00 79,200 79,20~
<br />north arcade
<br />precast concrete base
<br />896
<br />sf
<br />40.00
<br />35,840
<br />35,840
<br />6" cmu backup 6,532 sf 8.50 55,522 55,522
<br />brick veneer 4,276 sf 18.50 79,106 79,1-06
<br />soldier course
<br />steel framing
<br />14.4
<br />ton •
<br />3,000.00 ~
<br />43,146 ~
<br />43,146
<br />parapet / top flashing / cap 1,384 sf 12.00 16,608 16,608
<br />soffits / ceilings 1,384 sf 8.00 11,072 11,072
<br />Subtotal 954,858 0 0 954,858
<br />TOTAL - SITE WORK 52,058,505 $0 $0 $2,058,505