Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Desian Develo~ment Probable Cost Estimate <br />Ground Level <br />Transit <br />Transit / County <br />County <br />Total Area <br />Ground Level Tenant Finishes <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 <br />6,572 <br />4,826 <br />2,532 <br />13,930 sf <br />Cost/Unit Cost Total <br />Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: SDrina 99 <br />IVIC.I /'1LJ -.. <br />Miscellaneous metals <br />railings <br />wall rail <br />27 If 30.00 810 <br />405 <br />405 <br />@ ramp <br />etc <br />) <br />plate <br />ts <br />miscellaneous (angle 930 sf 0.25 3,483 <br />13 1,7~4"1 1,741 <br />. <br />, <br />, <br />, <br />Subtotal , <br />4,293 2,146 2,146 <br />TnTni _ nnFTai S $4,293 $2,146 $2,146> 0.31 <br />WOOD & PLASTICS <br /> <br />Rough carpentry <br />miscellaneous blocking & backing <br />13,930 <br />sf <br />0.20 <br />2,786 <br />1,393 ' <br />1,393 <br />center <br />latForm @ conf <br />raised 340 sf 15.00 5,100 2,550 2,550 <br />. <br />p ' 3 <br />Subtotal 7,886 3,943 3,94 <br />Finish carpentry <br />chair rail <br />188 <br />If <br />8.00 <br />1,504 <br />752 <br />752 <br />Subtotal 1,504 752 752 <br />Casework <br />restrooms <br />plam lav counter <br />23.0 <br />If <br />95.00 <br />2,185 <br />2,185 <br />shared 21.0 If 95.00 1,995 998 998 <br />bus waitin <br />4'0" dia island cabinet <br />su <br />~ <br />information counter 30.0 If 350.00 10,500 10,500 <br />information desk 6.0 If 350.00 2,100 2,100 <br />base cabinet 19.0 If 165.00 3,135 3,135 <br />counter 27.0 If 90.00 2,430 2,430 <br />Ground Level Tenant Improvements Detail Estimate - Page 1 <br />