Laserfiche WebLink
Courtho ~ Square Architec ~~1 Cost Consultants, LLC Estimate Da ': r~18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckie Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Ground Level <br />Transit 6,572 <br />Transit / County 4,826 <br />County 2,532 <br />Total Area 13,930 sf , <br />Ground Level Tenant Finishes Quanti Unit Cost/Unit Cost Total Comments <br />Markerboards / Tackboards <br />markerboard <br />tackable surface <br />Subtotal <br />Toilet partitions - plastic laminate, ceiling <br />ADA <br />shared <br />standard <br />shared <br />urinal screen <br />Subtotal <br />Signage Systems <br />directories <br />signage <br />Subtotal <br />Lockers & Benches <br />Bench <br />Subtotal <br />Fire extinguisher & cabinets <br /> ea 0.00 0 <br />400 sf 8.00 3,200 <br /> <br />2 ea 690.00 1,380 <br />2 ea 690.00 1,380 <br />4 ea 575.00 2, 300 <br />3 ea 575.00 1,725 <br />1 ea 250.00 250 <br /> <br />1 sum 1,500.00 1,500 <br />13,930 sf 0.14 2,000 <br /> <br />6 If 35.00 210 <br /> <br />2 ea 250.00 500 <br />' ' NIC - By Tenant <br />1,60~ 1,SQa allowance -@ conf. rooms <br />3,200 ' 1,600 ` 1,fiC10' <br />Subtotal <br />2,300 <br /> '863 $63' <br /> 250 <br />7,035 1,,553 5,483 <br /> 750 750 <br /> 1,OOQ : 1 000 <br />3,500 ' 1,750 1,750'' <br /> 210 <br />210 ' 0 210 <br /> 250' 250' verify <br />500 <br />Ground Level Tenant Improvements Detail Estimate - Page 9 <br />