Laserfiche WebLink
Courtho`u~se Square <br />Court 8~ High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Devetopment Probable Cost Estimate <br />Architect`ural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 <br />Estimate Date: R1&Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: <br />99 <br />Second Floor <br />Total Area 27,552 <br />27,552 sf <br />Second Floor Tenant Finishes Quanti Unit Cost/Unit Cost Total Comments <br />SPECIAL CONSTRUCTION <br />Item sf 0.00 0 0' <br />Subtotal p p , ,; p, <br />TOTAL - SPECIAL CONSTRUCTION ~0 $Q $0' 0.00 <br /> <br />MECHANICAL <br />HVAC <br />HVAC system <br />27,552 <br />sf <br />2.50 <br />68,880 <br />68,880 <br />Subtotal <br />Plumbing <br />sinks <br /> <br />2 <br /> <br />fixt. <br /> <br />2,500.00 <br /> <br />5,000 68,880 ' Q 68,880 <br /> <br />5,000 2.50 <br />Subtotal <br />Fire sprinklers <br />sprinklers <br /> <br />27,552 <br /> <br />sf <br /> <br />0.50 <br /> <br />13,776 5,000 0 5,000 <br /> <br />13,776 0.18 <br />Subtotal 13,776 ' 0 13,776 0.50 <br />TOTAL - MECHANICAL $87,656 $0 $87,656 3.18 <br /> <br />ELECTRICAL <br />Power & Lighting 27,552 sf 3.50 96,432 96,432 <br />Subtotal 96,432 0 96,432 <br />TOTAL - ELECTRICAL _ ~96,432 $0 $96,432 3.50 <br /> <br />SUBTOTAL 3s9,s52 $399,952 0 399;952 <br /> 0 <br /> <br />GENERAL CONTRACTOR FEE <br />ESTIMATING CONTINGENCY <br />INDEX TO CONSTRUCTION START <br /> <br /> <br />pring 99 . <br />3.75% <br />7.00% <br />0.75% <br />16,161 <br />31,298 <br />3,588 <br /> <br /> <br />82,042 <br />0 <br />0 <br />0 ~ <br />1',6,1'61 <br />31,298 <br />3,588 <br /> <br /> <br />t 3% per year <br />TOTAL DIRECT CONSTRUCTION COST <br />Second Floor Tenant Finishes <br />27,552 <br />sf <br />$17.49 /sf <br />$481,994 <br />' $0 <br />$481,994 <br />Second Floor Tenant Improvements Detail Estimate - Page 5 <br />