Laserfiche WebLink
~! Compile and re~•ie~~ desi~n intent documents. <br />• Include commissioning in bid documents. <br />Construction Phase. <br />• Develop commissionina plan outline. <br />• Define commissioning scope. <br />• Develop tentative schedule. <br />• Define team Riembers and responsibilities. <br />• Define documentation requirements for each <br />• Define training format. <br />• Conduct commissioning scoping meetina. <br />• Present commissioningplan outline. <br />• Obtain proiect schedules. <br />• Review contractor submittals. <br />• Review O&M manuals. <br />• Perform site visits. <br />~ Observe start-up tests, TAB procedures d ct pressu <br />• Observe re-functional erformance te s. <br />• Review develo ed and submitted fun ional erform <br />~- <br />Acceptance Phase. <br />! Observe functional erfor nce tests. <br />• Review trainin <br />contractors «~ith trai <br />Submit final report. <br />two <br />s ana ma <br />tans. <br />staff and assist <br />~ Final Re ort. S bmit the final re ort at the end of the commissionin rocess, usu; <br />to four weeks fter the functional erformance testin is com leted. The document <br />udes all of t e documentation enerated bv Contracto_r durin~ the commissionina <br />process. ~ <br />D elo er the Commissionina Aaent witl facilitate and coordinate the testina of <br />buildi Q s stems but Develo er is not res onsible for determinin whether the testina is <br />ade ate for actuallv conductin~ the testin itself or for the erformance of the s~~stems. <br />D elo er's standard of care is set forth in Section 4.1 of the Aareement. <br />~ <br />i <br />, <br />er. <br />tests <br />32 01:~790RED <br />