Laserfiche WebLink
~ requested on each such date, aild (c) the dates of substantial completion of tlie priman~ structural <br />and mecllanical elements of tlie Buildina. <br />~'~can-.<j ~ r <br />6.4 ~ iica r~mrntonh .~...a .a.~.` .,t o~F .-r.. •.. ' '~ ,?.n:~1 <br />shall ~~erify that the .lr ~r;k•'~ - <br />general contractor on the Project have acquired and are maintaining such insurance as is required <br />by their contracts. <br />6.5 Phvsical Inspection ~,~~ ~~p~~`~~1~ <br />1o~s. <br />~,~~ rt~~~•~` Ma,.,~~ ~ ~ <br />During the Construction Period, B~eI~F shall observe he Project ~z•ith <br />sufficient fr uency so that ~~ '~~` shall, at all times, be apprised of he then-current status of <br />construction to '' conformance ~vith the construction document .~e--F shall become <br />acquainted with the Final Plans referred to in construction documents. \ M"'~ `~`~ <br />6.6 Construction Reports <br />~~~AU~a_~e ~ <br />During the Construction Period, ~1€~ shall work with the architect to render <br />to Owner, within t~venty (20) days of the end of each calendar month, a report for such month, <br />which report shall contain at least the follo~~~ing: <br />6.6. I The actual construction progress achieved during such month and <br />~ to-date, and a comparison thereof to scheduled construction progress for the same periods; <br />6.6.2 The actual expenditures made during such month and to-date, by <br />category of expenditure, and a comparison thereof to budgeted expenses; <br />6.6.3 The estimated cost of completion of the Project; <br />6.6.4 The remaining available balance of funds budQeted by O~vner for <br />construction. <br />6.7 Potential Defaults <br />M~an, .-j~ r <br />-I~~ shall promptly infonn Owner, in detail, of any default or anticipated <br />default by the architect, the general contractor, or any other contractor under the architect's <br />contract, the construction contract, or the Other Project Contracts, respectively, or by O~ti~ner <br />under any such agreement, as to which~~~~ has any actual kno«~ledge or information. <br />Mc~enacr <br />6.8 Gover~iment Pennits <br />M~a,,:x.3er K;,.-,;= c:>U~.~.2~ <br />~k~shall~~„~r,~;n~fA ~r,~~,:r~,..~~ ..,,..F ,,,,,,,,,,,,, ,,F:... ~,~,:~,..:~ i to obtain, or <br />cause to be obtained, any and all governmental certificates, licenses, permits and appro~~als, <br />necessary to the development, construction, occupancy and operation of the Project. <br />~ 6.9 As-Built Plans <br />~~ ~ I-~790RED <br />