Laserfiche WebLink
~ <br />1.3.4.2 If the Termination Date is after completion of the <br />schematic dra«~inas of the redesianed Pro'ect hut rior to com letion of the F' <br />Plans for ttle Pro'ect, ttie Termination Fee sfial( be (~0 % of the I3asic F, less tha <br />portion of the I3asic. Fee alreadv paid to Developer as of the Ter ' tion Date: <br />1.3.4.3 If the Termination Date ' er com letion of the Fina <br />Plans but rior to the Com letion Date, the Ter 'nation Fee shall be 80 % of the <br />Basic Fee and 70% of the Commissionin e, less that ortion of the Basic Fee and <br />the CommissioninQ Fee alreadv a' o Developer as of the Termination Date: and <br />1. . If the Termination Date is after the Com letion Date. <br />but rior to com ion of Commissionin as defined in Section 2.3 of the attache~ <br />Schedule 2 e Termination Fee sha(1 be 100% of the Basic Fee lus 80 % of the <br />Co ssionina Fee, less that ortion of the Basic Fee and the Commissionina Fee <br />readv paid to Deve(oper as of the Termination Date. <br />2. Definitions <br />The terms detined in this Section shall, for all purposes of this AQreement, have <br />the meanings herein specified. unless the context othec-~vise reauires: <br />2.1 The term "Project Budget" shall mean budaet of expenditures relating to <br />~ the Project prepared by\Be~e~e~er, and accepted by Owner. <br />~~~~~~~~~r <br />2.2 The term "Applicable Laws" shall mean all governmental la~vs, <br />ordinances, rules, regulations. requirements, or restrictions imposed by the United States, the <br />State of Oregon, the County of Marion, the City of Salem or anv other~jurisdiction, which as a <br />~, .~- , <br />matter of law, are applicable to the Project, this Agreement.h3~~~~e~-, Owner, or the parties' <br />conduct under this Agreement. including but not limited to the FT'A Requirements. to the ertent <br />to which~~~~is required by law to comply with the FT_-~ Requirements. <br />M,a~:~,~.~~ <br />P~1c~~a~~r <br />2.3 The term "Basic Fee" shall mean the fee pavable to ~eu~.Le.p~ as <br />described in Section 2.1.01 of the attached Schedule 2. <br />2.4 The term "Completion Date" shall mear. that date on «~hich all of the <br />following conditions shalf have been met: (a) the construction of the basic Buildina has been <br />completed, (b) a certificate of occupancy shall have been issued therefor, (c) tenant~ <br />impravements for the initial oftice space in the Building to be occupied by O~~ner ~-e-~t~ <br />~ not to exceed~9~69e square fee~~have been ~ompleted, and (d) the Buildina <br />equipment a~ld systems are operational. '~~' <br />.~ <br />. e , <br />~, e~re~-S~e~red-rrFe~-~- , <br />J <br />~ 2.~' The terrn "Construction Period" shall me; n the period of time <br />commencina on the date hereof vld endin~ on the Completion Date. <br />3 oi~;;?o hE~ <br />