<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />Court & High Street James A. Jerde, AlA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM
<br />Design Development Probable Cost Estimate _ Phone (503) 297-7210 Fax (503) 297-7187 _ _ ______~ Construction Start: Spring 99 _
<br />_ . - -- --- -- - -
<br />- - - --
<br />~Streetscape 1 QuantitY Unit CosUUnit Cost Total Comments
<br />___-- - _
<br />_ ~ _ _ --- _ _ _ _ -- - -- - - - - -- 1
<br />Canopies
<br />east buiiding elevation
<br />west building elevation
<br />south main entry
<br />south building elevation
<br />southwest pavilion (grid A13)
<br />pavilion (grid A10)
<br />clock tower
<br />pavilion (grid A3)
<br />northwest pavilion (grid A1)
<br />Subtotal
<br />Bridges
<br />steel framing
<br />metal decking
<br />paint / finish exposed steel
<br />soffit - paint exposed decking
<br />gutters
<br />Subtotal
<br />Arcades / Pavilions / Clock Towers
<br />precast concrete base
<br />6" cmu backup
<br />brick veneer
<br />soldier course
<br />steel framing
<br />metal decking
<br />membrane roofing
<br />metal panel
<br />, parapet coping
<br />~, so~ts / ceilings
<br />' roof trellis @ clock towers
<br />I; clock faces
<br />~ paint exposed steet
<br />! Subtotal
<br />TOTAL - SITE WORK
<br />312 sf 55.00 17,160
<br />132 sf 55.00 7,260
<br />312 sf 75.00 23,400
<br />1,260 sf 55.00 69,300
<br />144 sf 55.00 7,920
<br />96 sf 55.00 5,280
<br />32 sf 55.00 1,760
<br />96 sf 55.00 5,280
<br />0 sf 55.00 0
<br />---_ _- --
<br /> - -
<br />137,360
<br />9.7 ton 3,000.00 29,160
<br />2,900 sf 2.75 7,975
<br />3,268 If 3.50 11,438
<br />~ 2,900 sf 1.00 2,900
<br />~ 80 If 8.00 640
<br />i 52,113
<br />~~
<br />1,428 sf 40.00 57,120
<br />~
<br />; 9,160 sf 8.50 77,861
<br />5,112 sf 18.25 93,294
<br />I 796 If 27.00 21,492
<br />' 10.2 tons 3,000.00 30,723
<br />156. sf 3.00 6,468
<br />~ 2,156 sf 5.00 10,780
<br />I 2,090 sf 35.00 73,150
<br />I 560 If 18.00 10,080
<br />~I 2,156 sf 8.00 17,248
<br />1,144 sf 35.00 40,040
<br />' 2
<br />~ ea 10,000.00 20,000
<br />! 1 sum 3,000.00 3,000 _
<br />- - --
<br />, 461,25f
<br />
<br />- - --- - - -
<br />_-_ - 51,377,93~
<br />Streetscape Detail Estimate - Page 4
<br />T
<br />17,160I
<br /> 7,260
<br />' 23,400
<br />I 69,300
<br /> 7,920
<br /> 5,280
<br />i 1,760
<br />~ 5,280
<br />or
<br />0
<br />~ 0 137,360
<br />~
<br />29,160
<br />~ 7,975
<br /> 11,438 ~
<br /> 2,900
<br /> 640
<br />0 0 52,113
<br /> Z(o,-D`
<br />, 57,120
<br /> 77,861
<br /> ~ 93,294
<br />~, 21,492
<br />j ~ 30,723
<br /> 6,468
<br /> ~ o,~so
<br /> 73,150
<br /> 10,080
<br /> 17,248
<br />~ 40,040
<br /> 20,000
<br /> 3,000
<br />~ 0 0 461,256
<br />~-- $0 f _ __ $0 $1,377,937 ~
<br />IIC - future
<br />~~7.~1~ ~
<br />v,r., , ~
<br />P s X 4 . ~ 71,~~~.r.
<br />~
<br />~ 2l~•~E/~%
<br />rerify
<br />allowance I