Laserfiche WebLink
Courthouse Squa~e Architectural Co~t Consultants, LLC Estimate Date: R21,Aug-98 <br /> <br />, <br />Court & High Street <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA ~ <br />DocumeM ~ate: 23,1u1-98 <br /> Salem, Oregon 6441 SVN Canyon Court, Suite 103 Print Date: 21-Aug-98 ! <br /> Arbuckle Costic Architeds, Inc Portland, Oregon 97221 Print Time: 11:12 AM ; <br /> Des' n Devetopment Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construdion Start: S rin 99 ~ <br /> <br />t <br />I DIRECT CONSTRUCTION COST SUMMARY ~ <br />i ~ <br /> <br /> <br />~ Component , <br />~ ~ . <br />Area $/ SF Cost ' Comments ! <br /> <br /> <br />i Buildi~g Shell & Core <br />~ ~ <br /> <br />153,343 sf 73.45 11,262,900 ------ -- - <br />~ <br />~ <br />i <br />i <br />i Parking ~ <br />70,793 sf 42.67 3,020,512 <br />~ <br />, Bus Mall I <br />66,528 sf 37.63 2,503,582 , <br /> <br />~ Subtotal <br />! I <br />224,136 sf 74.90 $16,786,995 , <br />i <br />! <br /> <br />Streetscape <br />I <br />33,720 sf 50.15 1,691,150 ' <br />~ <br />I <br />Subtotal 33,72o sf 50.15 $1,691,150 I <br />Tenant Finishes I <br />I <br />I Ground Level Tenant Finishes 13,930 sf 42.85 596,862 ~ ~ <br />~ Second Floor Tenant Finishes 27,552 sf 17.49 481,994 ~ <br />' Third Floor Tenant Finishes <br />~ 28,279 sf 24.66 697,318 ' <br />Fourth Ftoor Tenant Finishes <br />; Fifth Floor Tenant Finishes 28,279 sf 22.72 642,601 <br />16,850 sf 31.11 524,203 , ~ <br />,~ <br />• <br />~ ~ 114,890 sf 25.62 $2,942,978 ~ <br />~ <br />, <br />! TOTAL DIRECT CONSTRUCTION C OST $21,421,123 j ~ <br />0 <br />Indicated Surplus / (Oeficitj (2~,42~,~23) I <br />ALTERNATES <br />1 Parking Altemate 1 23,278 sf Add t 930,300 I <br />2 Parking Altemate 2 19,467 sf Add t 808,500 <br />3 0 - p ~ <br />40 p I <br />The above estimates are for direct construction cost only. They do not include fumishings & equipment, consuftant ' <br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any ' <br />other normally associated development costs. ' I <br />i <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major ~ <br />sub-trades as well as the general oont~actors. All work to be contracted at one time (shell & core, street 8~ bus mall and I <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. ! <br />The above estimates assume a construction start date of: Spring 99 If the start of constn.iction is delayed <br />beyond the date above, the estimates must be indexed at a rate of 4-6°k per year compounded. <br />_~ <br />Summary - Page 1 <br />