Courth~se Square
<br />Court & High Street
<br />Salem, Oregon
<br />~Arbuckie Costic Architects, lnc
<br />Design Development Probable Cost Estimate
<br />iStreetscape
<br />Canopies
<br />east building elevation
<br />west building elevation
<br />south main entry
<br />south building elevation
<br />southwest pavilion (grid A13)
<br />pavilion (grid A10)
<br />clock tower
<br />pavilion (grid A3)
<br />northwest pavilion (grid A1)
<br />Subtotal
<br />Bridges
<br />steel framing
<br />metal decking
<br />paint / finish exposed steel
<br />soffit - paint exposed decking
<br />gutters
<br />Subtotal
<br />Arcades / Pavilions / Clock Towers
<br />precast concrete base
<br />6" cmu backup
<br />brick veneer ~
<br />soldier course
<br />steel framing
<br />metal decking
<br />membrane roofing
<br />metal panel
<br />parapet coping
<br />soffits / ceilings
<br />roof trellis @ cloek towers
<br />clock faces ,
<br />paint exposed steel
<br />Subtotal
<br />TOTAL - SITE WORK
<br />Architectural Cost Consult
<br />ants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />~ Quantity Unit CosUUnit Cost
<br />; 312 sf 55.00 17,160
<br />' 132 sf 55.00 7,260
<br />312 sf 75.00 23,400
<br />' 1,260 sf 55.00 69,300
<br />144 sf 55.00 7,920
<br />96 sf 55.00 5,280
<br />32 sf 55.00 1,760
<br />96 sf 55.00 5,280
<br />0 sf 55.00 0
<br />9.7 ton 3,000.00 29,160
<br />2,900 sf 2.75 7,975
<br />3,268 If 3.50 11,438
<br />2,900 sf 1.00 2,900
<br />80 If 8.00 640
<br />1,428 sf
<br />9,160 sf
<br />5,112 sf
<br />796 If
<br />102 tons
<br />2,156.0 sf
<br />2,156 sf
<br />2,090 sf
<br />560 If
<br />2,156 sf
<br />1,144 sf
<br />2 ea
<br />1 sum
<br />40.00
<br />8.50
<br />18.25
<br />27.00
<br />3,000.00
<br />3.00
<br />5.00
<br />35.00
<br />18.00
<br />8.00
<br />35.00
<br />10,000.00
<br />3,000.00
<br />57,120
<br />77,861
<br />93,294
<br />21,492
<br />30,723
<br />6,468
<br />10,780
<br />73,150
<br />10,080
<br />17,248
<br />40,040
<br />20,000
<br />3,000
<br />~ .
<br />Estimate Dale: R21-Aug-98~
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Prinl Time: 11:20 AM
<br />Construction Start: Spring 99 ~
<br />_ _.--
<br />Total ~ --- ~
<br />~ County J ,Transit _( Streetscape_~ Comments
<br />I _ . ; -- i
<br />I
<br />, I ~ 17,160 ~
<br />i ~ 7,260 ~
<br />~ 23,400I
<br />' 69,300I
<br />~ 7,920 ~
<br />5,280 ~
<br />~ 1,760i
<br />I __.~I 5,280.
<br />_ _ ' ___ _O;NIC - future
<br />_ .. _.___.._.
<br />_ ~ - . ~_ .
<br />137,360~ 0; 0 137,360'
<br />52,113`--- - 0
<br />, 29,160 ;
<br />7,975'
<br />11,438 ,
<br />' 2,900 ;
<br />_ 640!
<br />_ _-__- -- -0 ;----- -52,113!
<br />i
<br />I
<br />~ ~
<br />: i
<br />~
<br />i
<br />~
<br />i ~
<br />~ ~
<br />~
<br />~ i ~
<br />, ; , ;
<br />--- -- ~ ~
<br />461,256 ! p ; - _....____ O
<br />I
<br />51,377,937 ~ $p , $p .
<br />Streetscape Detail Estimate - Page 4
<br />' S7,120 ~
<br />77,861 ~
<br />93,294 I
<br />21,492 '
<br />30,723 ~
<br />6,468 I
<br />10,780 ,
<br />73,150 ~
<br />10,080 i
<br />17,248 jverify
<br />40,040 ~
<br />20,000 ~allowance
<br />_ 3,000 !
<br />461,256 ~
<br />$1,377,937