Laserfiche WebLink
~ <br />Gourthouse Squa~e Architectural Cost Consultants, LLC Estimate oate: R2~-Aug-ss ~ <br />COUft &!-li~h Stre8t James A. Jer~e, AI~ - Stanley J. Pszczolkowski, RIA QoWrr~e,it Date: 23Ju1-98 j <br />Salem, Oregon 6441 S1/'J Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc <br />~ Portland, Oregon 97221 Print Time: 11:12 AM <br />Des <br />n Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 ~ <br />I <br />~ DIRECT CONSTRUCTION COST SUMMARY j <br />~ ~ <br />Component <br />Building Shell & Core <br />Area S / SF <br />Cost <br />153,343 sf 73.45 11,262,900 <br />70,793 sf 42.67 3,020,512 <br />66,528 sf 37.63 2,503,582 <br />224,136 sf 74.90 $16,786,995 <br />33,720 sf 50.15 1,691,150 <br />33,72o sf 50.15 $1,691,150 <br />~ Parking <br />I <br />Bus Mall <br />~ Subtotal <br />i <br />Streetscape <br />Subtotal <br />Tenant Finishes <br />i Ground Level Tenant Finishes <br />Second Floor Tenant Finishes <br />I Third Floor Tenant Finishes <br />~ ~ Fourth Floor Tenant Finishes <br />j Fifth Floor Tenant Finishes <br />_ .. I <br />13,930 sf 42.85 596,862 <br />27,552 sf 17.49 481,994 <br />28,279 sf 24.66 697,318 <br />28.279 sf 22.72 642,601 <br />16,850 sf 31.11 524,203 <br />114,890 sf 25.62 $2,942,978 <br />TOTAL DIRECT CONSTRUCTION COST <br />0 <br />Indicated Surplus / (Deficit) <br />ALTERNATES <br />1 Parking Altemate 1 23.278 sf <br />2 Parking Altemate 2 19 467 sf <br />30 ~ <br />40 <br />521,421,123 <br />(21,421,123) <br />Add t 930,300 <br />Add t 808,500 <br />0 <br />0 <br />Comments <br />The above estimates are far direct construction cost only. They do not inGude fumishings & equipment, consultant <br />fees, inspection and testing fees, plan chedc fees, hazardous material testing and removal, fi~ancing costs, nor any <br />other noRnally associated development costs. - <br />The above estimates assume a competitively bid project, with at least th~ee qualified bidders in each of the major <br />sub-trades as well as the general oontractors. All woiic to be contracted at one time (shell & core, street & bus mall and <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The above estimates assume a oonstruction start date of: Spring 99 If the start of construcdon is delayed <br />t~eyond the date above, the estimates must be indexed at a rate of 4-6% per year compounded. <br />Summary - Page 1 <br />