My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Precision Industrial
>
CS_Courthouse Square
>
Financial- Precision Industrial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:30:32 PM
Creation date
9/6/2011 3:56:55 PM
Metadata
Fields
Template:
Building
RecordID
10218
Title
Financial- Precision Industrial
Company
Marion County
BLDG Date
10/9/1997
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SALEM COURTHOUSE SQUARE, INC. <br />ASBESTOSABATEMENT <br />1997 <br />PROPOSAL <br />SALEM COURTHOUSE SQUARE, INC. <br />ASBESTOS ABATEMENT <br />SECTION 00300 <br />RFP <br />PAGE 1 OF 4 <br />' To be coordinated! with the Demolition Confractor for total project completion within 60 days. <br />OF <br />ALL STRUCTURES BOUNDED BY COURT STREET, CHURCH STREET, <br />CHEMEKETA and HIGH STREET IN SALEM, OREGON <br />1997 <br />301 This abatement must be coordinated with the demolition contractor to meet established dates of <br />completion. Having cazefully examined the project specifications and conditions relating to the work, the <br />undersigned agrees to enter into a contract with Mazion Counry to fumish all labor, materials and other <br />services required by, and in strict accordance with the plans and specifications for the following sum: <br />Base Proposal Amount: <br />Remove and dispose of all asbestos containing materials except materials aloud to remain as demolition <br />debris such as asphalt impregnated mastics and roofing materials. This project includes a Base Proposal of <br />removal and disposal of approximately 12,000 In, ft. of Thermal System Insulation, 5,814 sq. ft. of Sheet <br />Vinyl Flooring, 29,388 sq. ft. of 9x9 and 12x 12 Floor Tile, 370 sq. 8. of Floor Tile under Sheet Vinyl, 80 <br />sq. ft.of Furnace Lining, 315 sq. ft. of Cement Asbestos Board, all Fire Doors, 1,856 sq.ft. of Drywall and <br />Taping Compound, 696 sq. ft. of lxl Ceiling Tile and Mastic, 3,000 sq. ft. of friable built-up Roofing, <br />7,950 sq, ft. of Ceiling Acous[ical, Cove Base Mastic, 200 sq. ft of Stair Tread Mastic, 2,100 sq. ft. of <br />Duct Insulation, 10 sq. ft. of Vibration Joint Cloth, Leveling Compound in flooring, 3,400 sq. ft. of 2x4 <br />Ceiling Tile, all Silver Paint on ducts and flashing, 12,000 sq. ft. of Silver Paint on built-up roofing, 600 <br />sq. ft. of Flashing Sealer Cloth, 5,000 sq. ft. of Plaster Exterior building material, 160 sq. ft. Ceramic Tile <br />Mastic, 360 sq. Ft. of Carpet Mastic and make pliable 30,387 sq. ft. of 9x9 and 12x12 Floor Tile Mastic. <br />Dollazs Cents $ <br />Additive Alternate Proposals: <br />Per-Unit Cost for the removal and disposal of Thermal System Insulation: cosVsq.ft. .....$ <br />Per-Unit Cost for the removal and disposal of Thermal System insulation:cosUln.f[. ......$ <br />Per-Unit Cost for the removal and disposal Of additional Floor Tile: cosdsq.ft ..........$ <br />Per-Unit Cost for the removal and disposal of DrywalllTaping Compound: cosUsq.ft. .....$ <br />Per-Unit Cost for the removal and disposal of Sheet Vinyl: cost/sq.ft . . . . . . . . . . . . . . . . . . $ <br />Courthouse Squaze Projec[ <br />Amendment #2 <br />Mazch 27, 1997 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.