My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) <br />DISCHARGE MONITORNG REPORT <br />Permittee: Marion Co!in+.~ (File I~To. 109691) Facility: Courthouse Square <br />3150 Lancaster Dr. NE 59~ Court Street <br />Salem, Oregon 9730~-1398 Salem, Oregon <br />Permit No.: 1500A Principal Executive Officer: Mr. Billy ~Vasson <br />Telephone: 503 589-32~7 <br />Filing Date: July 12, 1999 <br />Monitorina Period: June 1, 1999 through June 30, 1999 (no discharge 22"d throu;h 30`h) <br />Discharge Parameter Data: <br /><Parameter QuantitylConcentration' <br /><Minimum Maximum > Permit <br />:Discharge <br />`, Limit <br />Flow - 200,020 gallons 300 gpm <br />pH 7.7 8.7 6-9 <br />Benzene < 0.000~ m~/L < 0.0005 mg/I. 0.02~ mg/L <br />BTEX < 0.003 mg/I, < 0.003 m;/L 0.25 m;/L <br />Total Petroleum Hydrocarbons <br />(N WTPH-Dx) < 0.0005 mg/L 0.321 m~/L 1.0 m~/L <br />I cerlify under penalty of law that this document and all attachments were prepared under my <br />direction or sirpervision in accor•dance tivith a system designed to asstrre that qaialified personnel <br />properly gather nnd evaluate the information strbmitted. Based on my inquiry of the person or <br />persons ~vho manage the system, or those persons directly responsible for gathering the information, <br />the information subrnitted is, to the best of my knotivledge nnd belief, trare, accarrate, and complete. <br />1 am ativare that there are significant penalties for strbmitting false informntion, inclzrding the <br />possibility offine and impr~sonrnent for knotiving violations. <br />Eric Collins, R.G. <br />Project Manager (CWEC) <br />for I3illy ~~Iassoi~ (Mai-iori Count}~) <br />Z ~ <br />Date <br />Century 1Vest En~ineering <br />P:140306001271chs699.dis <br />4050600127 <br />July 12, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.