My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) <br />Permittee <br />Permit No. <br />DISCHARGE MONITORING REPORT <br />Marion County (File No. 109691) Facility: Courthouse Square <br />3150 Lancaster Dr. NE 595 Court Street <br />Salem, Oregon 97305-1398 <br />Salem, Oregon <br />1500A Principal Executive Officer: Mr. Billy `Vasson <br />Telephone: 503 589-3257 <br />Filing Date: August 5, 1999 <br />Monitoring Period: July 1, 1999 through July 31, 1999 (no discharge) <br />Discharge Parameter Data: <br />Parameter Quantity/Concentration ' <br /> <br /> <br />, Minimum Maximum Permit <br />Discharge <br />Limit <br />Flow - 0 gallons 300 gpm <br />PH 6-9 <br />Benzene 0.025 mg/L <br />BTEX 0.25 mg/L <br />Total Peh-oleum Hydrocarbons <br />(N WTPH-Dx) 1.0 mg/L <br />1 cert~ under penalty of law that this document and all attachments tivere prepared a~nder my <br />direction or sa~pervision in accordance tivith a system designed to assure that qualified personnel <br />properly gather and evaluate the information stibmitted. Based on my inquiry of the person or <br />persons tivho manage the system, or those persons directly responsible for gathering the information, <br />the information submitted is, to the best of my knowledge and belief, trare, accurate, c~nd complete. <br />1 am aware that there are significant penalties for szrbmitting false information, inclirding the <br />possibility offine and imprisonment for knotiving violations. <br />~ ~ <br />Eric Collins, R.G. <br />Project Manager (CWEC) <br />for Billy Wass~n (Marion C~nnty) <br />Century West En~ineering <br />P:\4030600127\chs799.dis <br />g s ~y <br />Date <br />4080600127 <br />August 5, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.