My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Specialty Analytical Date: 08-Apr-99 <br /> <br />CLIENT: Century West Engineering Client Sample ID: UST9-1-12.0' <br />Lab Order: 9903130 Collection Date: 3/25/99 <br />Project: 4080600119 / Courthouse Square <br />Lab ID: 9903130-O1A Matrix: SOIL <br />Analyses Result Limit Qual Units DF Date Analyzed <br />NWTPH-DX NWTPH-DX Analyst: jmh <br />Diesel 36 20 mg/Kg-dry 1 3/29/99 <br />Lube Oil ND 68 mg/Kg-dry 1 3/29/99 <br />Surr: o-Terphenyl 106.0 50-150 %REC 1 3/29/99 <br />PERCENT MOISTURE D2216 Analyst: bda <br />Percent Moisture 26 0. wt% 1 3/29/99 <br />~ <br />1 of S <br />19761 SW 95th Place Tualatin, OR 97062 (503) 612-9007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.