My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to extend off-site. Field observations and analytical results for the Area 6 soil samples collected <br />during construction activities indicated that the gasoline impacted soil extended further north than <br />previously estimated. Although remedial excavation was completed in this area, the presence of the <br />sidewalk limited access for further removal of contaminated soil. <br />The total estimated volume of gasoline impacted soil left in place with concentrations above the 80 <br />mg/kg matrix cleanup level is 250 cubic yards. Figure 8 shows the estimated lateral extent of Area <br />6 impacted soil left in place. In the northern portion, the estimated vertical extent of impacted soil <br />left in place is limited to a two-foot thick layer of soil located between 16 and 18 feet below street <br />grade. In the southern portion, the estimated vertical extent of impacted soil left~in place is limited <br />to a four-foot thick layer of soil located between 14 and 20 feet below street grade. <br />A comparison between the BTEX concentrations detected in the Area 6 samples and the applicable <br />RBCA Tier I RBSLs indicates that the impacted soil left in place does not pose a threat to human <br />health or the environment. <br />6.1.3 Area 9 <br />Based on field observations and the analytical results for the Area 9 soil samples, the estimated <br />volume of diesel impacted soil left in place with concentrations above the 500 mg/kg matrix cleanup <br />level is 5 cubic yards. Figure 9 shows the estimated lateral extent of Area 9 impacted soil left in <br />place. The estimated vertical extent of impacted soil left in place is limited to two-foot thick layer <br />of soil located between 10 and 12 feet below street grade. <br />A comparison between the PAH concentrations detected in the Area 9 samples and the applicable <br />RBCA Tier I RBSLs indicates that the impacted soil left in place does not pose a threat to human <br />health or the environment. <br />6.1.4 Area 18 <br />Based on field observations and the analytical results for the Area 18 soil samples, the estimated <br />volume of diesel impacted soil left in place with concentrations above the 500 mg/kg matrix cleanup <br />level is 25 cubic yards. Figure 6 shows the estimated lateral extent of Area 18 impacted soil left in <br />place. The estimated vertical extent of impacted soil left in place is limited to three-foot thick layer <br />of soil located between 14 and 17 feet below street grade. <br />A comparison between the PAH concentrations detected in the Area 18 samples and the applicable <br />RBCA Tier I RBSLs indicate that the impacted soil left in place does not pose a threat to human <br />health or the environment. <br />Construction Phase - Remedial Actions - 22 - 4080600127 <br />Courthouse Square November 9. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.