My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~. <br />. ~ ~ ~ ~ ~ ~ ., <br />r <br />.~ S.: <br />~ ~ ~ ', <br />" ~ ~~' ,E~=- , <br />~ :w .:a ~ ~ i' <br />~ - ~~~ '~ r' <br />-._.,~. ,,~..-~, <br />S ecialt Anal tical <br />p y Y <br />19761 S.~V. 95th Place <br />Tualatin, OR 97062 <br />(503) 612-9007 <br />Fax (503) 612-8572 <br />1 (877) 612-9007 <br />May 26, 1999 <br />Eric Collins <br />Century West Engineering <br />825 NE Multnomah <br />Suite 425 <br />Portland, OR 97232 <br />TEL: (503) 231-6078 <br />FAX (503) 231-6482 <br />RE: 4080600127/4102 - Courthouse Square <br />Dear Eric Collins, <br />Order No.: 9905131 <br />Specialty Analytical received 1 sample on 5/21/1999 for the analyses presented in the following <br />report. <br />There were no problems with the analyses and all data for associated QC met EPA or laboratory <br />specifications except where noted in the Case Narrative, or as qualified with flags. Results <br />apply only to the samples analyzed. Reproduction of this report is permitted only in its entirety, <br />without the written approval from the Laboratory. <br />If you have any questions regarding these tests, please feel free to call. <br />Sincerely, <br />~ ~:..~ c~ ~~1~~~.~:_...-_ <br />Cindy Day Technical Review <br />Project Manager <br />Specia[tyl~nalytical, An Oregon Corporaiinn <br />
The URL can be used to link to this page
Your browser does not support the video tag.