My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REMEDIAL ACTIONS REPORT <br />CONSTRUCTION PHASE <br />Courthouse Square - Salem, Oregon <br />~ <br />1.0 INTRODUCTION <br />Century West Engineering Corporation (Century West) was retained by Marion County to conduct <br />site investigation and remedial actions for the Courthouse Square project located in downtown <br />Salem, Oregon (Figure 1). The project involves redevelopment of an entire city block. In the <br />summer of 1997, surface structures on the Courthouse Square property were demolished, including <br />buildings, parking structures, and paved areas. Currently, a subterranean parking structure is being <br />constructed to a depth of approximately ten feet below street grade extending throughout the block. <br />Above ground, the southern portion of the site will be developed for office/retail use. The central <br />portion of the site will be developed as a transit mall. The northern portion will be left for future <br />development and may include residential units. <br />This document summarizes remedial actions conducted during the initial phase of construction <br />between March 15, 1999 and August 5, 1999. The construction phase remedial actions were <br />completed in accordance with Century West's Remedial Action Plan (Century West 1999a). <br />The purpose of the construction phase remedial actions was to manage environmental issues on the <br />Courthouse Square property in accordance with state and local regulations and secure a"no further <br />action" determination for the property from the Oregon Department of Environmental Quality <br />(DEQ). Specific objectives of the construction phase remedial actions included: 1) ensuring worker <br />safety related to subsurface contamination, 2) characterizing the nature and extent of subsurface <br />contamination, 3) managing water generated during construction dewatering operations, 4) managing <br />the excavation, transport, and disposal of contaminated soil, and 5) evaluating the risk associated <br />with potentially contaminated soil and/or groundwater left in place. <br />2.0 SITE DESCRIPTION <br />2.1 Site Setting <br />The site is an approximately 2.5-acre, square-shaped parcel of land located in downtown Salem. <br />The property is bounded to the north by Chemeketa Street, to the east by Church Street, to the south <br />by Court Street, and to the west by High Street (Figure 1). The property is located in Sections 22 <br />and 27, Township 7 South, Range 3 West of the Salem West Quadrangle. <br />Construction Phase - Remedial Actions - 1- 4080600127 <br />Courthouse Squaze November 9, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.