My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~'ATIONf1L POLLUTION DISCHARGE ELI~~IINATION SYSTEi~1 (NPDES) <br />DISCHARGE MONITORTNG REPORT <br />Permittee: Marion County (File No. 109691) Facility: Courthouse Square <br />3150 Lancaster Dr. NE 59~ Court Street <br />Salem, Oregon 97305-1398 Salem, Oregon <br />Pern~it No.: 1500A Principal EYecutive Officer: Mr. Billy Wasson <br />Telephone: 503 589-3257 <br />Filin~ Date: May 11, 1999 <br />Monitoriilg Period: April 12, 1999 tlu-otibh April 30, 1999 (no discharge on 13th or 18th) <br />Discharge Parameter Data: <br />Parameter Quantity/Concentration <br /> Minimum I~I~ximum Permit <br />Discharge . <br />Limit <br />Flo~v - 287,77~ gallons 300 gpm <br />pl-[ 7.4 8.5 6-9 <br />Benzene < 0.0005 m~/L < 0.0005 m~/L 0.02~ m~/L <br />BTEX < 0.003 mg/L 0.00063 m~/L 0.2~ mg/L <br />Total Petroleum Hydrocarbons <br />(N WTPH-Dx) < 0.000~ m~/L 0.59 mo/L. 1.0 mg/I. <br />I certify trnder penalty of lativ that this document and all attachments were prepared zrnder my <br />direction or supervision in accordance tiv~th a syste~n designed to assure that qualifred personnel <br />propej~ly gather and evaltrcrte the infoj-mation strbmitted. Based on my inqtrify of the person or <br />persons ti~~ho manage the systern, or those persons directly responsible for gathering the information, <br />the infor~mat~on sarbrrtitted is, to the best of my knotivleclge and belief, trrre, accirrate, arid complete. <br />1 nm mvare thcrt there are significant penaltie.s for• subrnitting false informntion, inclzrding the <br />~ossibiliry of fine and impj•isonmej2t for knotiving vlOIC1l10j15'. <br />, ~' ' <br />, ~ <br />~ ~ _`-, I I ~ ~ <br />Eric Colliits, R.G. <br />Project Manager (C~VEC) <br />for }3illy Wassoli (Nlarion County) <br />Date <br />Century ~Vest Engineering 4050600127 <br />P:14080600127\chsd99.dis May 1 I, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.