My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) <br />DISCHARGE MONITORING REPORT <br />Permittee: Marion County (File No. 109691) Facility: Courthouse Square <br />3150 Lancaster Dr. NE 595 Court Street <br />Salem, Oregon 97305-1398 Salem, Oregon <br />Permit No.: 1500A Principal Executive Officer: Mr. Billy Wasson <br />Telephone: 503 589-3257 <br />Filing Date: June 4, 1999 <br />Monitoring Period: May 1, 1999 through May 31, 1999 <br />Discharge Parameter Data: <br />Parameter Quantity/Concentration <br />' Minimum Maximum Permit <br />Discharge <br />Limit <br />Flow - 925,850 gallons 300 gpm <br />pH 7.8 8.4 6-9 <br />Benzene < 0.0005 mg/L < 0.0005 mg/L 0.025 mg/L <br />BTEX < 0.003 mg/L < 0.003 mg/L 0?5 m j/I, <br />Lead < 0.025 mg/L < 0.025 m;/L 0.2 m~/L <br />Total Petroleum Hydrocarbons <br />(N WTPH-Dx) < 0.0005 m~~L. O.3H Ill~/L 1.0 mg/1. <br />I certify under penalty of lativ that this document and all uttachments tivere prepared under my <br />direction or szrpervis~on in accordance tivith a system designed to assure thnt qrralified personnel <br />properly gather and evaluate the inforntation submitted. 13ased on my in~uiry of the person or <br />persons tivho manage the system, or those persons directly responsible for gatheririg the information, <br />the information subrnitted is, to the best of my knowledge and belief, true, accin~ate, and complete. <br />1 am aware that lhere are significant penalties for submitting false information, including the <br />possibility of~ne nnd imp~~isonment for knoiving violations. <br />/-~~ _ / <br />;; /~, <br />< ~:~/r/ ~ L <br />r '-i `-_ <br />~ ~ ~~ ~ , CO ~~~ I <br />Eric Collins, R.G. <br />Project Manager (CWEC) <br />for Billy Wasson (Marion County) <br />Date <br />Century West Engineering <br />P:14080600127\chs599.dis <br />4080600127 <br />June 4, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.